My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-09_REVISION - M2002120 (18)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2002120
>
2019-10-09_REVISION - M2002120 (18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:11:33 PM
Creation date
10/10/2019 12:30:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002120
IBM Index Class Name
REVISION
Doc Date
10/9/2019
Doc Name
Adequacy Review #3
From
Civil Resources
To
DRMS
Type & Sequence
AM1
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
=34 <br /> CIVIL RFS-VURCFS,L.11 <br /> ENGINEERS 6 PLANNERS <br /> RECEIVED <br /> October 1, 2019 OCT Q 9 2Q19 <br /> r. Eric Scott WSION OF RECLAMATION <br /> Division of Reclamation, Mines, and Safety MINING MD SAFE <br /> 1313 Sherman Street, Room 215 �1�� <br /> Denver, Colorado 80203 FS V6P'IK/ <br /> SIv1 werc, <br /> RE: Adequacy Review 3 for 112 Construction Materials Reclamation Amendment 1 to the Permit, <br /> Bernhardt Gravel Mine, Permit M-2002-120; Response <br /> Dear Mr. Scott: <br /> This letter is being generated to satisfy the review dated September 24, 2019 for the Bernhardt Gravel Mine. <br /> The italicized items are the current comment and the bold text are the responses: <br /> The Division of Reclamation, Mining, and Safety has completed its second adequacy review of your 712 <br /> construction materials reclamation permit amendment application. The application was called complete for <br /> review on May 3, 2019. All comment and review periods began on May 3, 2079. The decision date for this <br /> application has been extended to October 7, 2079. Please be advised that if you are unable to satisfactorily <br /> address any concerns identified in this review before the decision date, it will be your responsibility to <br /> request an extension of the re view period. If there are outstanding issues that have not been adequately <br /> addressed prior to the end of the review period, and no extension has been requested, the Division may <br /> deny this application. In order to allow the Division adequate time to review your responses to any adequacy <br /> issues,please submit your adequacy responses to the Division no later than one week prior to the decision <br /> date(September 30, 2019). <br /> Please note that any changes or additions to the application on file in our office must also be reflected in the <br /> public review copy, which has been placed with the Weld County Clerk and Recorder. A copy of the <br /> response has been delivered to Weld County and the confirmation is attached. <br /> The review consisted of comparing the application content with specific requirements of Rule 6.1, 6.2, 6.4 <br /> and 6.5 of the Minerals Rules and Regulations of the Colorado Mined Land Reclamation Board for the <br /> Extraction of Construction Materials. As with most applications, there are items that will require clarification <br /> of the existing information. Any remaining inadequacies are summarized below- <br /> Please remove previous permit boundary currently shown on the north and east side of the <br /> amended parcel on al/maps, so that the new permit boundary is accurately depicted. Please also <br /> include full size color copies of all final maps included in the application. The permit boundary is <br /> now shown as one perimeter line on all applicable drawings. <br /> Spillway slopes on the reclamation plan map are all listed as 5H:1H. Please correct. The 5H:1V is <br /> correct as this is the profile of the spillway along the crest. The section of the spillway is <br /> labeled as 3H:1V down to the bedrock grade. <br /> Please correct the following issues with Figure 2c-Structures <br /> Structure#7(Hillsboro Irrigation Ditch)appears to be missing/unlabeled or mislabeled on <br /> the Figure 2C provided. The ditch has been updated on all drawings. It should be <br /> noted the ditch is not the Hillsborough Ditch and it is the Big Thompson and Platte <br /> River Ditch. This has been updated and the correct ditch owner was originally <br /> notified as shown in Adequacy Review 2 correspondence. <br /> 323 FIFTH STREET• P.O. Box 680 0 FREDERICK, COLORADO B0530 0 PHONE: 303.B33. 1 41 6 0 FAX: 303.833.21350 <br />
The URL can be used to link to this page
Your browser does not support the video tag.