Laserfiche WebLink
NEWMONT <br /> G O L D CO R P. Newmont Goldcorp <br /> Cripple Creek&Victor Mine <br /> 100 N 3`d Street <br /> PO Box 191 <br /> Victor,CO 80860 <br /> newmontgoldcorp.com <br /> SENT CERTIFIED RETURN RECEIPT REQUESTED RECEIVED <br /> 7018 0360 0001 1957 5236 <br /> AUG 21 2019 <br /> August 19, 2019 <br /> DIVISION OF RECLAMATION <br /> MINING AND SAFETY <br /> Mr. Timothy Cazier, P.E. <br /> Environmental Protection Specialist <br /> Colorado Department of Natural Resources <br /> Division of Reclamation, Mining and Safety <br /> Office of Mined Land Reclamation <br /> 1313 Sherman Street, Room 215 <br /> Denver, Colorado 80203 <br /> Re: Permit No. M-1980-244; Cripple Creek & Victor Gold Mining Company; Cresson <br /> Project; Technical Revision 117 — Squaw Gulch Valley Leach Facility Phase 2A <br /> Part 1 Record of Construction Report, , Adequacy Review No. 1 and 2 Response <br /> Dear Mr. Cazier: <br /> On August 5, 2019 Newmont Goldcorp Corporation - Cripple Creek and Victor Gold Mining <br /> Company (CC&V) received the Division of Reclamation, Mining and Safety's (DRMS) <br /> preliminary adequacy review of Technical Revision (TR) No.117. Subsequently, CC&V received <br /> DRMS Adequacy Review No. 2 on August 16, 2019. Below are DRMS's comments are noted <br /> under a subtitle for adequacy review one and two; in italics followed by CC&V's responses in <br /> bold. <br /> Adequacy Review No. 1, dated August 5, 2019: <br /> 1. Squaw Gulch — 19VLF Phase 2A-1 and 2A-3 Soil Liner Fill Asbuilt, Drawing 3 of 3: The <br /> drawing does not include a professional Land Surveyor (PLS) or Professional Engineer <br /> (PE) stamp, signature or date. Pursuant to Rule Rules 6.2.1(2) and 7.3, drawings require <br /> a date, and registered land surveyor/professional engineer signature. Please resubmit <br /> this drawing with the required professional signature, date and stamp. <br /> This drawing has been updated to meet requirements of Rule 6.2.1(2) and 7.3, and <br /> is enclosed in this response. <br /> 2. Squaw Gulch — 19VLF Phase 2A-1 and 2A-3 High Volume Collection Pipe Asbuilts, <br /> Drawings 2 and 3 of 3: No obvious means to determine the relationship between these <br /> two drawings, such as a site coordinate system or match lines are provided, making it <br /> difficult to assess their spatial relationship. Please include matchlines such as those in <br />