Laserfiche WebLink
pf COO o <br /> �! COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> Y <br /> * 1876 F" 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> REQUEST FOR TECHNICAL REVISION{TR)COVER SHEET RECEIVED <br /> File No.: M- 1983-035 Site Name:VOIImer Pit MAY 3 n ZW8 <br /> County EI Paso TR# moo MEDOlAMNAT10N <br /> P Schmidt Construction Comr)anv MINING AND SAFETY <br /> ermittee:Operator(If Other than Permittee): M-1983-035 — TR04 <br /> Permittee Representative: Mark Heifner Complied!No prior Violations! <br /> tcl, mac <br /> Please provide a brief description of the proposed revision: <br /> To update the approved reclamation plan for closure of the site to further mining. Plan adapts <br /> the GFiginal plan to the GUFFent eenditiORS Fesulting ftem only mining abeut half of the mate <br /> contained in the permit. <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time,in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR;however,it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type- Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(l, 2 or 3) $1006 ❑ <br />