My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-30_REVISION - M1983035 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983035
>
2018-05-30_REVISION - M1983035 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:21:09 PM
Creation date
5/30/2018 12:36:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983035
IBM Index Class Name
Revision
Doc Date
5/30/2018
Doc Name
Request for Technical Revision
From
Schmidt Construction Co.
To
DRMS
Type & Sequence
TR4
Email Name
TC1
MAC
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Marie A. Heffner <br /> 37 East Colorado Avenue • Denver,Colorado 80210-3105 • (303)777-3371 or(303)906-8096 <br /> May 30,2018 <br /> Tim Cazier <br /> Division of Reclamation,Mining and Safety <br /> 1313 Sherman Street Room 215 <br /> Denver, CO 80203 <br /> RE:Technical Revision for Vollmer Pit <br /> Permit No: M-1983-035 <br /> Bear Tim: <br /> Enclosed are two copies of a Technical Revision that provides an update to the permitted reclamation plan. <br /> This can also be considered a closure reclamation plan as no additional mining is expected to occur at this site. <br /> The plan is based on the original plan and simply proposes the reclamation actions needed to reclaim the land <br /> even though only about half of what was originally proposed was mined. It also modernizes the original plan, <br /> but final land uses have not changed and only minor changes were made to the original plan to account for the <br /> current situation. <br /> The property has been transferred to Turkey Canon Quarry,Inc. who will soon gain possession of the permit <br /> through a succession of operator.That will occur after this reclamation plan is approved and the release of <br /> about 26 acres is approved. Thus,this plan is step 2 of a 3 step process of transferring the permit. The release <br /> request was sent yesterday via certified mail as required and that should be reviewed along with this plan as <br /> more or less a unit. The boundaries in the plan are derived from the release request boundaries and the two <br /> make reference to each other. <br /> If you have any questions,plcasc contact me. <br /> Thank you for your consideration. <br /> Respectfully, <br /> 4;4G" 1 -4 <br /> Mark A. I icifncr <br /> cc: Schmidt Construction Company <br /> Turkey Canon Quarry,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.