My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-17_REVISION - M2002004
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2002004
>
2017-03-17_REVISION - M2002004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:25:34 PM
Creation date
3/17/2017 3:31:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002004
IBM Index Class Name
REVISION
Doc Date
3/17/2017
Doc Name
Request for Technical Revision
From
GCC Rio Grande - Pueblo Plant
To
DRMS
Type & Sequence
TR6
Email Name
ERR
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OF COO <br /> COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> "1876" 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> REQUEST FOR TECHNICAL REVISION(TR) COVER SHEET <br /> File No.: M- 2002004 site Name:GCC Rio Grande - Pueblo Plant <br /> county Pueblo TR# (DRMS Use only) <br /> Permittee:GCC Rio Grande Inc. - Pueblo Plant <br /> Operator(If Other than Permittee):N/A TRO <br /> Permittee Representative: <br /> Edwin Olivares '� )mplied! MAR If2017 <br /> '/0 Violation o,,,w,,,,I,,Ar,o <br /> Please provide a brief description of the proposed rev_ iSAFE,y <br /> Technical Revision request to incorporate Groundwater Monitoring Well 1;b (Ivivvuuv) <br /> As defined by the Minerals Rules, a Technical Revision(TR)is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted(mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 <br /> 1IOd, 112d(l,2 or 3) $1006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.