Laserfiche WebLink
ATCOLORADO <br />Division of Reclamation, <br />14iining and Safety <br />Department of Natural Resources <br />MINERALS PROGRAM INSPECTION REPORT <br />PHONE: (303) 866-3567 <br />The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br />noted below. This report documents observations concerning compliance with the terms of the permit <br />and applicable rules and regulations of the Mined Land Reclamation Board. <br />MINE NAME: <br />MINE/PROSPECTING ID#: <br />MINERAL: <br />COUNTY: <br />Lupton Meadows Gravel Mine <br />M-2016-076 <br />Sand and gravel <br />Weld <br />INSPECTION TYPE: <br />INSPECTOR(S): <br />INSP. DATE: <br />INSP. TIME- <br />IME:Preo <br />Preoperation <br />eration Inspection <br />Eric C. Scott <br />December 14, 2016 <br />09:30 <br />OPERATOR: <br />OPERATOR REPRESENTATIVE: <br />TYPE OF OPERATION: <br />BestwaySoncrete Company <br />Mark Johnson <br />112c - Construction Regular Operation <br />REASON FOR INSPECTION: <br />Preoperation Inspection <br />BOND CALCULATION TYPE: <br />None <br />BOND AMOUNT: <br />No Bond Held <br />DATE OF COMPLAINT: <br />POST INSP. CONTACTS: <br />JOINT INSP. AGENCY: <br />NA <br />None <br />None <br />WEATHER: <br />INSPECTOR'S SIGNATURE: <br />SIGNATURE DATE: <br />Cloudy <br />December 19, 2016 <br />The following inspection topics were identified as havine Problems or Possible Violations. OPERATORS <br />SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br />Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br />Reclamation Board will consider possible enforcement action. <br />INSPECTION TOPIC: Signs & Markers <br />PROBLEM/POSSIBLE VIOLATION: Problem: The affected area boundary markers are missing. This is a problem <br />for failure to maintain boundary markers around the affected area as required by Section 3.1.12(2) of the rule. <br />CORRECTIVE ACTIONS: The operator shall conduct a survey and replace the boundary markers in the correct <br />location(s). The operator shall provide proof to the Division that this has been done by the corrective action <br />date. <br />CORRECTIVE ACTION DUE DATE: 1/13/17 <br />J <br />Page 1 of 3 <br />