My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-06_REVISION - M1980244 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2016-09-06_REVISION - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 2:24:55 PM
Creation date
9/7/2016 12:46:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
9/6/2016
Doc Name
Request for Technical Revision
From
Newmont
To
DRMS
Type & Sequence
TR83
Email Name
TC1
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NE W M O N T ///� Newmont Mining Corporation <br /> R83 - 6363 South Fiddler's Green Circle,Suite 800 <br /> Greenwood Village.CO 80111 <br /> Complied T719-689-2977 <br /> F 719-689-3254 <br /> ✓5 Violations: MV— www newmont.com <br /> 1995-007, 1995-050, 1995-070, <br /> 2015-005,2016-035 RECEIVE) <br /> SENT CERTIFIED, RETURN RECEIPT REQUESTED SEP ® 6 2016 <br /> 7015-1660-0000-0779-7266 <br /> CRAM OF RECLAMATION <br /> VkNG&SAFETY <br /> September 1, 2016 <br /> Mr. Timothy Cazier, P.E. <br /> Environmental Protection Specialist <br /> Colorado Department of Natural Resources <br /> Division of Reclamation, Mining and Safety <br /> Office of Mined Land Reclamation <br /> 1313 Sherman Street, Room 215 <br /> Denver, Colorado 80203 <br /> Re: Permit No. M-1980-244; Cripple Creek & Victor Gold Mining Company ("CC&V") <br /> Cresson Project;— Squaw Gulch Valley Leach Facility (SGVLF) Haul Route to Phase I— Squaw Gulch Valley Leach Facility (SGVLF) Haul Route to Phase I— <br /> TR-83 <br /> Dear Mr. Cazier, <br /> As requested in the Division of Reclamation, Mining and Safety's (DRMS) June 16, 2016 <br /> Inspection Report, Newmont Mining Corporation (Newmont) hereby submits the following <br /> Technical Revision(TR) #83 that outlines Newmont's plan to manage the haulage of crushed ore <br /> and agglomerated tailings to the SGVLF and minimize any potential environmental impacts. <br /> Background <br /> In the June 16, 2016 Inspection Report, DRMS determined that "a TR will need to be submitted <br /> to propose a plan to ensure the haul road is over the liner system for haulage of crushed ore and <br /> agglomerated tailings from the Load-Out Bin to the SGVLF. Vehicular traffic for the SGVLF is <br /> currently not occurring over the liner system and there is a potential for off-liner impact." <br /> The design for construction of the SGVLF is described in Amendment 10 to the Cresson Project <br /> Permit. This design provides detail on the phased construction of the facility, additionally it <br /> allows for slight variations from the design drawings as a result of a number of different factors <br /> including climatic conditions, mine sequencing, contractor availability and other related factors. <br /> In TR72 DRMS approved the haulage of spent ore over unlined roads for a total distance of <br /> 9,200 ft. This TR also outlined a spill response plan and a decontamination plan to ensure this <br /> activity posed a minimal risk to the environment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.