My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-15_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2016-07-15_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:24:51 PM
Creation date
8/2/2016 9:34:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
7/15/2016
Doc Name
TC's Concerns regarding June 14, 2016 Cost Estimate
From
Twentymile Coal, LLC
To
DRMS
Type & Sequence
SI2
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/2/2016 State.co.us Executive Branch Mail - Fwd: Twentymile- SL2 Bond Calculations (Post -Conference Revision) <br />STATE F Hernandez - DNR, Alysha <alysha.hernandez@state.co.us> <br />COLORADO, <br />Hello Alysha, please scan this e-mail chain into the S12 (Not SL2) file for the Foidel Creek Mine, C-1982-056. <br />"TC's Concerns regarding June 14, 2016 Cost Estimate" <br />---------- Forwarded message ---------- <br />From: Ebert - DNR, Jared <jared.ebert@state.co.us> <br />Date: Mon, Jul 18, 2016 at 8:48 AM <br />Subject: Re: Twentymile - SL2 Bond Calculations (Post -Conference Revision) <br />To: "Nettleton, Jerry" <JNettleton@peabodyenergy,com> <br />Good morning Jerry, <br />For Task 146, prior to the informal conference on March 10, 2016 1 sent you a letter regarding the informal conference <br />and some changes that I had made to the original SI -02 cost estimate. I had found the original SI -02 estimate did not <br />take into account the additional liability required to spread cover material for the second phase of the Coal Refuse <br />Disposal Area. The liability associated with this task was revised with the approval of RN -06 but I somehow missed the <br />increase in material needed for this task with my original estimate. <br />For Task 182, 1 re -calculated the hours needed for the drill rig and water truck. The Division a few years ago surveyed <br />several drilling companies and came up with an average time to fill a boreholes with concrete (96.1 feet per hour). I used <br />this number to recalculate the hours needed for this task. <br />Please let me know if you have further questions. I will give you a call after lunch if I do not hear from you sooner to <br />discuss the estimate. <br />Thanks, <br />Jared <br />On Fri, Jul 15, 2016 at 9:18 AM, Nettleton, Jerry <JNettleton@peabodyenergy,com> wrote: <br />Jared — <br />I have reviewed the revised SL2 package, and for the most part , the revisions look reasonable. We appreciate your <br />consideration and efforts to address the questions raised in our informal bond review conference. <br />I do have two areas where there are remaining questions: <br />y- Task 146, Replace Cover Material on Refuse Disposal Area; In comparing your previous bond calculations (SL2 <br />Pre -Conference 02/19/16) with the recent revision, I noted that the material quantity had been increased significantly <br />from 318,924 ccy to 439,924 ccy, an increase of approximately 38%, with a corresponding increase of almost $80,000 <br />https://mail.googl e.com/m ai I/u/0/?ui=2&i k=e29129fcb5&view=pt&search= i nbox&th=1564b76bbc1905d9&si m l=1564b76bbcl 9O5d9 1/3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.