My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-09-25_REVISION - M1980244 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2015-09-25_REVISION - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:10:59 PM
Creation date
9/28/2015 3:06:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
9/25/2015
Doc Name
Request TR76
From
CC&V
To
DRMS
Type & Sequence
TR76
Email Name
TC1
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />f:5'I? <br />Cripple Creek & Victor Gold Mining <br />A Joint Venture ANGLOGOLD ASHANTI (COLORADO) CORP., Manager <br />Operations Office <br />P.O. Box 191 100 North 3`d Street <br />Victor, Colorado 80860 <br />719) 689-2977 — Fax (719) 689-3254 <br />SENT CERTIFIED, RETURN RECEIPT REQUESTED <br />7014-2870-0001-3417-6395 <br />23 September 2015 <br />Mr. Timothy Cazier, C"EVED <br />Environmental Protection Specialist <br />Colorado Department of Natural Resources <br />Division of Reclamation, Mining and Safety <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />t, -SEP 2 A l5 <br />DIVISION OF r's77CLAMATICN <br />MINING AND SAFETY <br />Re: Permit No. -1980-244: Cripple Creek & Victor Gold Mining Company ("CC&V" ); <br />Cresson Project; — Request for Technical Revision ("TR -76") two pipelines Arequa Gulch <br />Absorption, Desorption, Recover (AGADR) to Squaw Gulch ADR (SGADR) <br />Dear Mr. Cazier: <br />CC&V proposes Technical Revision No. 76 ("TR -76") to Amendment No. 10 of Permit M- <br />1980-244 ("AM10") to move the location of two pipelines — barren and fresh water from the <br />AGADR to SGADR. These pipes are described in Section 7.2.4 in the February 2012 Cripple <br />Creek and Victor Gold Mining Company Cresson Project Mine Life Extension 2 Permit M- <br />1980-244. 7.2.4 reads: <br />Two pipelines will be constructed from the AGADR to the SGADR to transfer fresh <br />water and barren solution from the AGADR as needed. The barren pipeline will be 24 - <br />inches in diameter and will be double -walled when outside of lined containment. The <br />fresh water line will be 12 -inches in diameter. <br />The proposed routes of the pipelines have been updated. This is shown on the attached revision <br />6 of drawing C-3. Pipe sizes are now 14" for the barren and 10-12" for the fresh water. Note: <br />The waterline is now coming off the crusher water line as opposed to the AGADR. <br />CC&V is planning to construct the in the 4rd Quarter of 2015 following approval of this TR by <br />the Colorado Division of Reclamation, Mining and Safety ("DRMS") and appropriate annrovals <br />from Teller County. <br />Compliance 1995-007, <br />IV4 <br />VIOLATIONS • 99 _070 & <br />MV2015-005 <br />MV -1995-050, MV - 1
The URL can be used to link to this page
Your browser does not support the video tag.