Laserfiche WebLink
CC&V is working with Teller County to insure the new development meets the terms of that <br />agreement, to classify TR -74 as a no impact technical revision to the Cresson Project Mine <br />Development Plan ("MDP"). <br />Water Tank Warranty Estimate <br />The barren and water lines are not included in the Warrantee calculation because this facility <br />SQVLF) will stay in operation into the post closure period to prevent discharge into Squaw <br />Gulch. There is, however, an additional water tank that will require demolition. (see attached <br />warranty estimate) <br />Please contact me at (719)-689-4055 should you have questions or wish to discuss this request <br />for a technical revision. <br />Sincerely, <br />r C" ry 1Q <br />Chris Hanks <br />Chief Environmental Coordinator <br />Environmental <br />xc: Lynda Morgan, Teller County Planning <br />Byron Hakes, Mayor, City of Victor <br />Attachments: Referenced Drawings <br />Enclosure: Check No. 400324