Laserfiche WebLink
U.S. DEPARTMENT OF INTERIOR <br />BUREAU OF LAND MANAGEMENT <br />t'kl' ROYAL GORGE FIELD OFFICE <br />3600 INSPECTION REPORT <br />The Bureau of Land Management (BLM) has conducted an inspection of the mining operation noted below. This report documents observations concerning <br />compliance of the mining operation with the permit and regulations (43 CFR 3600 — Mineral Materials Disposal) of the Department of Interior. The report notes: 1) <br />Areas of successful compliance; 2) Problems and suggested corrective actions and/ or 3) Potential violations to be considered enforcement action by the BLM. <br />OPERATORS SHOULD READ THIS REPORT CAREFULLY BECAUSE IT MAY REQUIRE CORRECTIVE ACTION AND/ OR RESPONSES TO THE BLM IN ORDER <br />TO AVOID CONSIDERATION OF POSSIBLE ENFORCEMENT ACTION. <br />GENERAL INFORMATION <br />MINE NAME: <br />OPERATOR: <br />............. ............................. _ ...... - ._.._..._.__ ................. _ <br />MAIN COMMODITY: <br />............_._ ................................................... _ ............................... _ <br />TYPE OF OPERATION: <br />COUNTY: <br />................... __...._.__.._........_. <br />LOCATION: <br />Mica White <br />. . . . . . ............... . ............. _ ......... . ....................... . <br />Colorado Quarries - Bill Tezak <br />..............__............. ............................... --- .._....................... <br />Mica <br />...................... _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .................................................. <br />112 <br />Fremont <br />. . . . . . . . . . . . . . . . . . . . . _ . . . . . . _ . . . . . . . . . . . . . . . . . . . . . . . . <br />Howard, CO <br />INSPECTOR(S)/ OP. REP PRESENT: Bridgette Miller- BLM, Jeff Covington - BLM, Kassandra Lindsey - BLM <br />................._._._.......—.__.._..._...._............._.._..._................__...-_..................................................................... ............................... -- ..__.._ - - -- ___.........................._.......................................................... ..........._..........._..._... <br />INSPECTION DATE: _ 8/27_/2014 <br />_....._...._ . __ _ <br />DATE OF COMPLAINT, if applicable: - Click here to enter text. . ......................._._.. . . <br />BLM COC #: <br />074887 <br />- ._.._ ._-.........................................._............. ...._.......................... ........ .............................._ .__ ............................................ ---- ---- — _...._... _.__............................................................. <br />... ..... ............ ..............................— <br />CDRMS PERMIT #: <br />M1992 -058 <br />............................... _ .... _.._ ....................................... _ ............... _.__ ... ..................................... _ ........ _... _..................................... ...............__...........__. <br />.............. ... .........--------._...-................................................... <br />MSHA ID #: <br />05 -04199 _............_...._...._....._- ..................... .......................................... _ .......... _..................................... <br />........................................................................................... ............................ - -- . <br />CONTRACT ACRES / AM'T/ LENGTH: <br />- _..._ <br />_.........._.................................................................................................................................................._.................. <br />10 acres /30,000 tons /July13, 2015 <br />. ........ __..._ -_.... -- .............................................._. __............._............... <br />_....__..... -- <br />TIME OF DAY: ..................................... <br />9:30 -11:20 <br />.................................................................................................................... _._ .......................... _. - - - -... _ ....................... _ .......... __._ .... _ .... _._...... ...--- .......................................................... <br />....... ......................... _......_..------ .... - ................. ......._.__. ............ ..._..__ <br />INSPECTION TYPE: ...................._.._.._._.. <br />Standard Inspection <br />_..__....__..._..._.................. _._......_........................................................ ..............................- - -- -_ . -.. - - ... - - - -- <br />-- - .............................................................................................................................................. <br />REASON FOR INSPECTION: ........................... <br />General _ _..._........_. <br />............................................................................................. _ .................... <br />-- ................. ...............- ........... - -_. ..... _................................................ <br />WEATHER CONDITION: <br />Cloudy <br />1. INSPECTION TYPES: Land Status, Mineral Testing, Potential Trespass, Pre - Operation, Post - Operation, Reclamation Status, Standard <br />Inspection, Standard Production Verification, Other <br />2. REASONS FOR INSPECTION: Bond Release, Citizen Complaint, General, Other Agency Request, Regulatory Requirement, Other <br />3. WEATHER CONDITIONS: Clear, Cloudy, Inclement — prevented inspection, Raining, Snowing, Windy <br />INTERNAL <br />Inspection Status: N <br />Y = Inspected and Found in Compliance, N = Inspected and Problems Noted, NA = Not Applicable <br />Inspector's Initials: _BMM <br />BLM Supervisor's Initials: SSC <br />Date: 1011512014 <br />Date sent to Operator: <br />