Laserfiche WebLink
e;oo.coco COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> h MINERALS PROGRAM INSPECTION REPORT <br /> 49% * PHONE: (303) 866-3567 <br /> *1876* TA-I< <br /> The Division of Reclamation,Mining and Safety has conducted an inspection of the mining operation <br /> noted below. This report documents observations concerning compliance with the terms of the permit <br /> and applicable rules and regulations of the Mined Land Reclamation Board. <br /> MINE NAME: MINE/PROSPECTING ID#: MINERAL: COUNTY: <br /> Larson Pit M-2007-012 Gravel,sand and cla` Phillips <br /> INSPECTION TYPE: INSPECTOR(S): INSP.DATE: INSP.TIME: <br /> Monitoring Elliott R.Russell September 15,2014 09:45 <br /> OPERATOR: OPERATOR REPRESENTATIVE: TYPE OF OPERATION: <br /> Gregory Larson Gregory Larson 112c-Construction Regular Operation <br /> REASON FOR INSPECTION: BOND CALCULATION TYPE: BOND AMOUNT: <br /> Normal I&E Program None $28,889.00 <br /> DATE OF COMPLAINT: POST INSP.CONTACTS: JOINT INSP.AGENCY: <br /> NA None None <br /> WEATHER: INSPECTO '§ GNMI'URE: SIGNATURE DATE: <br /> Cloudy W / December 23,2014 <br /> The following inspection topics were identified as having Problems or Possible Violations. OPERATORS <br /> SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br /> WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br /> Possible Violation is indicated,you will be notified under separate cover as to when the Mined Land <br /> Reclamation Board will consider possible enforcement action. <br /> INSPECTION TOPIC: Gen. Compliance With Mine Plan <br /> PROBLEM/POSSIBLE VIOLATION: Problem: The current mine plan needs to be updated and clarified <br /> pursuant to C.R.S. 34-32.5-112 (1)(c)(VI). The operator must provide sufficient information to describe or <br /> identify how the operator intends to conduct the operation. <br /> CORRECTIVE ACTIONS: The operator shall submit a Technical Revision, with the required$216 revision <br /> fee, to update and clarify the current approved mine plan to reflect existing and proposed activities by the <br /> corrective action date. <br /> CORRECTIVE ACTION DUE DATE: 2/21/15 <br /> Page 1 of 5 <br />