Laserfiche WebLink
ASPHALT <br />SPECIALTIES CO. <br />10100 Dallas St. • Henderson, C080640 • (303) 289 -8555 • Fax: (720) 289 -7707 <br />November 25, 2014 RECEIVED <br />Mr. Eric Scott, Environmental Protection Specialist DEC 01 2014 <br />Colorado Div. of Reclamation, Mining and Safety DIVISION OF RECLAMAON <br />1313 Sherman Street, Room 215 MINING AND SAFETY <br />Denver, Colorado 80203 <br />RE: Technical Revision No. �` Turnpike Mining Resource, DRMS Permit No. M- 2004 -009 <br />Dear Mr. Scott: )aj <br />As required in your inspection report for the referen a mine site performed on September 23, <br />2014, I am submitting our Technical Revision No. ; .4his TR addresses expansion of mining <br />Cell 3 in the central area of the permit site due to the removal of oil and gas facilities and also <br />due to additional mineable material being deposited into this area by Boulder Creek during the <br />flooding of September 2013 and a change to the mining plan showing the location for the <br />importation and processing of asphalt and concrete into recycled materials for road construction. <br />This TR consists o£ <br />• A text portion describing the changes being requested for approval by this TR. <br />• A revised Exhibit C -2- Sheets 1 and 2 (the mine plan) showing the changes being <br />requested by this TR. <br />• A revised Exhibit L- Reclamation Costs showing an increase in the bonding requirement <br />for this site by $16,000.00 for removal of stockpiled materials that could not be buried <br />onsite, and <br />• A check in the amount of $216.00 to cover the processing cost of this TR. <br />Please contact me if there are any questions or concerns you may have with this TR submittal <br />after you have had time to review it. <br />Sincerel <br />Rob Laird <br />Resource Manager <br />cc: file <br />Dan Hunt <br />