Laserfiche WebLink
10/21/2014 State.co.us Executive Branch Mail - New Horizon, C-1981-008, TR-64 RCE <br />STATE, OF Hernandez - IDNR, Alysha <alysha-hernandez@state-co-us> <br />COLORADO <br />New Horizon, C-1981-008, TR-64 RCE <br />1 message <br />......................................................................................................................................................................................................................................................................................................................................................................................... <br />Musick - DNR, Jason <jason.musick@state.co.us> Tue, Oct 21, 2014 at 10:09 AM <br />To: Rob Zuber - DNR <rob.zuber@state.co.us> <br />Cc: Alysha Hernandez - DNR <alysha.hernandez@state.co.us>, Mary Rodriguez - DNR <br /><mary.rodriguez@state.co.us> <br />Rob, <br />Attached is the Division's reclamation cost estimate for the New Horizon Min'e TR-64. This estimate includes <br />costs for a 350' above ground extension of a previously approved French drain segment to intercept spoil spring <br />water and route it to the Pond 013 flume. <br />The estimate includes costs installing the 18" pipe above ground. The costs are based on the plans as detailed <br />on proposed Map 2.05.3(3)-21. <br />Please let me know if you have any questions or comments. <br />Jason Musick <br />Environmental Protection Specialist III <br />Coal Regulatory Program <br />A&17 COLORADO <br />Division of RectaiTiation, <br />Miim.ftig and, Safety <br />Departrnerrt o Natuml ffi-,sowces <br />P 303.866.3567 x 8134 1 F 303.832.8106 <br />1313 Sherman Street, Room 215, Denver, CO 80203 <br />jason.musick@state.co.us I http: //mining. state.co. <br />in <br />100_S u m m ary_v2. pdf <br />83K <br />hftps:llmail.google.com/mail/ul0/?ui=2&ik=e29129fcb5&view=pt&search=inbox&th=14933784aba9l297&siml=14933784aba9l297 <br />