My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-21_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2014-10-21_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:49:08 PM
Creation date
10/21/2014 1:48:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
10/21/2014
Doc Name
Cost Estimate
From
Jason Musick
To
Rob Zuber
Type & Sequence
TR64
Email Name
JDM
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Technical Revision No. 64 Summary of Tasks <br />Permit Action: Technical <br />Site: New Horizon Mine Revision 64 Permit/Job #: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 100 State: Colorado <br />Date: 10/20/2014 County: Montrose <br />User: JDM <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C008 -100 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />103 <br />Install Additional Above Ground Pipe Segment C <br />DEMOLISH <br />1 <br />10.00 <br />$6,047.29 <br />SUBTOTALS: <br />10 <br />$6,047 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02% <br />Total = <br />$122.15 <br />Performance bond: <br />1.05% <br />Total = <br />$63.49 <br />Job superintendent: <br />16.45 hrs <br />Total = <br />$1,236.38 <br />Profit: <br />10.00% <br />Total = <br />$604.70 <br />TOTAL O & P = <br />$2,026.72 <br />CONTRACT AMOUNT (direct + O & P) = <br />$8,073.72 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and /or contract/bid preparation: <br />4.61% <br />Total = $37220 <br />Reclamation management and /or administration: <br />3.58% <br />$289.04 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $2,687.96 <br />TOTAL BOND AMOUNT (direct + indirect) = $8,734.96 <br />
The URL can be used to link to this page
Your browser does not support the video tag.