Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 100 <br />DEMOLITION WORK <br />Task description: Install Additional Above Ground Pipe Segment C <br />Site: New Horizon Mine Permit Action: Technical Revision 64 <br />PROJECT IDENTIFICATION <br />Task #: 103 State: Colorado <br />Date: 10/20/2014 County: Montrose <br />User: JDM <br />Agency or organization name: DRMS <br />UNIT COSTS <br />Page 2 of 2 <br />Permit/Job #: C1981008 <br />Abbreviation: None <br />Filename: C008 -103 <br />Location adjustment: 92.10 % <br />Structure or Item <br />Demolition Menu <br />Unit <br />Total Cost <br />Description <br />Dimensions <br />Selection <br />Quantity <br />Unit <br />Cost <br />Above Ground <br />350 LF <br />Pipe - 18" <br />350.00 <br />LF <br />$18.76 <br />$6,566.00 <br />Segment C Pipe to <br />Pond 13 Flume <br />Total Cost <br />Subtotal (adjusted for <br />Job Hours: 10.00 (unadjusted): $6,566.00 location): $6,047.29 <br />CRCES Cost Estimating Software <br />