My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-21_REVISION - M1999042
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999042
>
2014-08-21_REVISION - M1999042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:13:01 PM
Creation date
8/22/2014 8:45:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999042
IBM Index Class Name
REVISION
Doc Date
8/21/2014
Doc Name
Request for technical revision TR03
From
Avalanche Creek Marble and Alabaster LLC
To
DRMS
Type & Sequence
TR3
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O� .0 <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />* <br />X876 * 1313 Sherman Street, Room 215, Denver, Colorado 80203 ph(303) 866 -3567 <br />R 4 REQUEST FOR TECHNICAL REVISION JR) COVER SHEET <br />FileNo.: M- 1999 -042 Site <br />County: Pitkin TR #, <br />- EDWIS -Ue R n, j'IJ' <br />Operator (I fOther than Permittee) Elbram Stone LLC Permittee: Avalanche Creek Marble and <br />Alabaster LLC: <br />Representative: James King, Esquire <br />Please provide a brief description ofthe proposed revision: This technical revision is to delete Sheep fescue <br />seed from the approved seed list and agree to use only native grass and shrubs in reclamation, as set forth <br />in the attached letter. This addition is a minor effect upon the approved reclamation plan. <br />As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />meets this definition. If.the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes to <br />the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the app \ "opriate fee, the Division will <br />determine if it is approvable within 30 days. Ifthe Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. Ifat the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre - defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Tyne Required TRFee Submitted (mark only one) <br />I IOc, 111, 112 construction <br />materials, and 112 quarries $216 <br />112 hard rock (not DMO) <br />110d, I 12d(1, 2 or 3) <br />V', 6Icj -i' ovL5 M V2W5 0 15 <br />$175 <br />$1006 <br />k�-- m V ?--cG�0C 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.