My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-07_REVISION - M2012032 (12)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2014-07-07_REVISION - M2012032 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:19:09 PM
Creation date
7/9/2014 8:48:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
REVISION
Doc Date
7/7/2014
Doc Name
Request for TR04
From
Star Mine Operations
To
DRMS
Type & Sequence
TR4
Email Name
RCO
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� p pf Cpl <br />COLORADO DIVISION OF RECLAMATION, <br />MINING AND SAFETY <br />I s + 1313 Sherman Street, Room 215, Denver, Colorado 80203 ph(303) 866 -3567 <br />"j'P,o [ — REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br />File No.: M- 2012 -032 Site Name: Revenue Mine <br />County O u ray TR# (DRMS Use only) <br />Permittee: Star Mine Operations <br />Operator (If Other than Permittee): <br />Permittee Representative: Rory Williams <br />Please provide a brief description of the proposed revision: <br />This revision TR -04 provides details for the 6 existing groundwater well installations, adds an <br />equipment storage area and allows eeneurrent use of the Atlas tailings area. TemperaFy tails <br />storage areas are also added. and adds three new wells to the plan. <br />As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. If the Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre- defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Tyne Required TR Fee Submitted (mark only one) <br />110c, 111, 112 construction <br />materials, and 112 quarries $216 <br />112 hard rock (not DMO) $175 <br />110d, 112d(1, 2 or 3) $1006 <br />0 JUL 0 i �� 14 <br />D1ViS1oN or- <br />✓/+F J— Apt 2 -5-15 nail( RED' , <br />✓ tUO V +'6jG4_41 orLc, <br />
The URL can be used to link to this page
Your browser does not support the video tag.