My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-04_REVISION - C1981041 (9)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2013-09-04_REVISION - C1981041 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:24:44 PM
Creation date
9/4/2013 1:04:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
REVISION
Doc Date
9/4/2013
Doc Name
Bond Release Application
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
SL8
Email Name
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mike Boulay -2- August 27, 2013 <br />12. Dollar Amount Requested for Release: $719,560.86 (89.3 %) <br />13. Legal Description of Area Requested: <br />Township 10 South, Range 98 West 6th P.M., Mesa County CO <br />All or portions of Sections 26, 27, 28, 34 & 35 <br />Township 11 South, Range 98 West 6th P.M., Mesa County CO <br />All or portions of Sections 1, 2, 11, 12, & 13 <br />Township 11 South, Range 97 West 6th P.M. Mesa County CO <br />All or portions of Section 7 <br />14. A Map Showing Area: Enclosed, see Bond Exhibit 1 <br />15. Dates Reclamation Work Performed: <br />South Lease Exploration - 7 acres for Phase II & III release. <br />4.0 acres of drill pads & access roads to drill holes PCC04 through PCC10 were <br />reclaimed and seeded in the fall of 1985 and 3.0 acres of drill pads & access roads to drill <br />holes PCC01 through PCC03 and access road from Colorado Ute power line to PCC09 <br />turnoff were reclaimed and seeded in the spring of 1986. Phase I bond release on these <br />acres was approved in August 2003 with SL -2. (Area #1 on Bond Release Map) <br />North Decline - 2.6 acres for Phase I, II & III release and 18.2 acres for Phase II & III <br />release. <br />2.2 acres at Pond 7, SAE sediment traps and 18" V -ditch were reclaimed and seeded in <br />October 2011. The road through the North Decline, which is 0.4 acres, will remain as a <br />permanent feature. (Area #3 on Bond Release Map) <br />17.7 acres at the North Decline portal, water treatment, storage areas and substation <br />were reclaimed and seeded in the fall of 1992 and spring of 1993. 0.5 acres at the North <br />Decline permanent mine dewater point was reclaimed and reseeded in April 2002. <br />These 18.2 acres received a Phase I bond release in August 2003 with SL -2. (Area #2 <br />on Bond Release Map) <br />NW Intake Portal - 0.1 acres for Phase II & III release. <br />0.1 acres at this portal was backfilled, reclaimed and seeded in the summer of 1993. <br />Phase I bond release on these acres was approved in August 2003 with SL -2. (Area #4 <br />on Bond Release Map) <br />Cameo Refuse Disposal Area #1 - 26.1 acres for Phase II & III release 1.2 acres for <br />Phase I release. <br />12.5 acres at CRDA #1, which included benches 1, 2 and 3, topsoil piles 5 & 6 and <br />salvage area 3, were reclaimed and seeded in July 1994. The remaining 14.8 acres <br />were reclaimed and seeded in April 2002, however 1.2 acres were re- disturbed and re- <br />seeded in 2010, therefore, only 13.6 acres are included in this bond release application. <br />Phase I bond release on these acres was approved in August 2003 with SL -2. (Area #5 <br />on Bond Release Map) <br />1.2 acres of access road to CRDA #1 that had been left open for coal fines cleanup was <br />reclaimed and seeded in September 2010. (Area #6 on Bond Release Map) <br />
The URL can be used to link to this page
Your browser does not support the video tag.