Laserfiche WebLink
BULLDOZER WORK <br />Task description: Fill in holes to final grade ( -1 acre total) <br />Site: Godsend Claim- CMC 252626 Permit Action: Pre -op <br />PROJECT IDENTIFICATION <br />Task #: 002 State: - Colorado <br />Date: 8/27/2013 County: Teller <br />User: TCW <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D3K XL - 3P <br />Horsepower: <br />74 <br />Blade Type: <br />Power Angle Tilt <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: $11.21 NA <br />Operating Cost/Hour: $27.17 100 <br />Ripper op. Cost/Hour: $0.00 _ 100 <br />Operator Cost/Hour: $37.41 NA <br />Total unit Cost/Hour: $75.79 <br />Total Fleet Cost/Hour: $75.79 <br />Pagel of 2 <br />Permit/Job #: M2013040 <br />Abbreviation: _None <br />Filename: M040 -002 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />1,210 <br />Swell factor: <br />1.000 <br />Loose volume: <br />1,210 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />50 feet <br />169.6 LCY /hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />8,800 feet <br />501bs/LCY <br />Weight description: Gravel - Dr <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.200 _ (CAT HB) <br />Dozing method: 1.000 (GEN.) <br />CIRCES Cost Estimating Software <br />