Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Pre - Operation Cost Estimate (2013) <br />Site: Godsend Claim- CMC 252626 Permit Action: Pre -op Permit/Job #: M2013040 <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 8/27/2013 _ County: Teller <br />User: TCW <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None _ <br />Filename: M040 -001 <br />Task <br />Descri tion <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />002 <br />003 <br />004 <br />Fill in holes to final grade (-1 acre total) <br />DOZER <br />1 <br />1 <br />1 <br />11.76 <br />$891.69 <br />$710.77 <br />$1,099.56 <br />Mob /demob (1 dozer) <br />MOBILIZE <br />2.20 <br />Reveg. —2 acre (broadcast seeding) <br />REVEGE <br />4.00 <br />SUBTOTALS: <br />17.96 <br />$2,702.02 <br />INDIRECT COSTS <br />0.00 <br />OVERHEAD AND PROFIT: <br />Engineering work and/or contractibid preparation: <br />Liability insurance: <br />0.00% <br />Performance bond: <br />0.00% <br />Job superintendent: <br />11.57 hrs <br />Profit: <br />10.00% <br />Total = <br />Total = <br />Total = <br />Total = <br />TOTAL O & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />$0.00 <br />$0.00 <br />$756.79 <br />$270.20 <br />$1,026.99 <br />$3,729.01 <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and/or contractibid preparation: <br />0.00% <br />Total = $0.00 <br />Reclamation management and /or administration: <br />5.00% <br />$186.45 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $1,213.44 <br />TOTAL BOND AMOUNT (direct + indirect) = $3,915.46 <br />