My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-08-27_REPORT - C1996083
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2013-08-27_REPORT - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:24:24 PM
Creation date
8/27/2013 11:00:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REPORT
Doc Date
8/27/2013
Doc Name
Certification Gob Pile #3 Haul Road
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Roads
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T =EC 'H <br />Civil, Structural & Geotechnical Engineers <br />December 12, 2012 <br />Ms. Tamme Stover <br />JE Stover & Associates, Inc. <br />2352 N. 7`h Street, Unit B <br />Grand Junction, CO 81501 <br />Re: Construction Materials Testing and Data <br />Bowie Mine Gob Pile Road <br />Bowie, Colorado <br />222 South Park Ave, • Montrose, CO 81401 <br />Ph.: (970) 249 -6828 • FAX: (970) 249 -0945 <br />TRANSMITTED VIA EMAIL: tamme.'estover resnan.net <br />Dear Tamme, <br />In accordance with your request, Buckhorn Geotech provided an engineering technician to <br />perform soil sampling, laboratory soils analysis, soils moisture - density testing, in -situ asphalt <br />density testing and sampling and analysis of asphalt as scheduled for the referenced site. <br />The data contained herein represents activities from October 23 through November 29, <br />2012. <br />Testing and inspection was performed in accordance with the project specifications as <br />provided to Buckhorn Geotech. All final test results have met or exceeded the project <br />specifications. <br />Should you require additional information or have any questions, please contact the <br />undersigned at 970 -249 -6828. <br />Sincerely, <br />I�f <br />Steven P. Rush, CET <br />Project Manger <br />Reviewed by: <br />Dan Quigley, P.E. <br />Attachments: Standard Proctor Sample No. 1 <br />Modified Proctor Sample No. 2 <br />Sieve and Atterberg Limits Sample Nos. 1 and 2 <br />Physical Properties of Asphalt Mix Sample No. 12 -0049 <br />Field Observation Report Nos. 1 through 8 <br />Moisture - Density Test Nos. S13-1 through SB -14 <br />Moisture - Density Test Nos. BC -1 through BC -3 <br />In -Situ Asphalt Density Test Nos. AC -1 and AC -2 <br />12- 274 -CUT Bowie Mine Gob Pile Road 12.12.12.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.