Laserfiche WebLink
• <br />Fill continues to be placed and compacted by method specification. A GPS dozer was observed shaping the <br />western downstream slope of the embankment. (See Fill section above for more detail) <br />I1) Storm Water Management <br />Best Management Practices (BMP) are being performed. <br />CQA ACTIVITIES: <br />n Field Activities: Construction activities and observation of production drilling, Cut, HWY 67 embankment fill <br />placement and compaction, clay field sampling were performed during this reporting period as required per project <br />specifications. <br />II) Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture - Density, gradations and material classification and identifications and material sampling were performed during <br />this reporting period as required. <br />LVSCF sample No.'s 23 thru 30 were obtained during this reporting period. <br />General Proiect Items <br />Meetings and Discussions: Weekly Project Status meeting was held at 10:00am on July 161^ between CC &V, Ames and <br />Amec. Topics discussed were Safety, Schedule, Project Issues, concerns and planning. <br />Summary of Concerns: None <br />CC& V. Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, Amec and Ames. <br />Miscellaneous: None <br />Deliveries: None <br />CQA Monitor <br />Submitted by: <br />Thorne M Clark <br />Project Resident Manager <br />Ph: 970.846.9337 <br />Approved By: <br />Date: �6 - P7 -I '3 <br />Page 3 of 5 MLE2 WE 07.20.13.doc <br />