i <br />I <br />Clay (SLF) Processing: <br />Cameron Site: No clay mining occurred during this reporting period due to a saturated site from previous rains. <br />However Clay processing continued from the clay stockpile and SLF sample No. 42 and No. 43 were obtained and <br />returned to our Laboratory for gradation analysis and permeability testing. <br />Squaw Gulch Site: <br />No work occurred at the VLF clay borrow site during this reporting period. <br />Underdrain System: <br />Secondary Underdrain: No worts was performed on the Secondary underdrain during this reporting period. <br />A total of 1380 feet of Secondary underdrain has been completed. <br />Primary Underdrain: No work was performed on the Primary underdrain during this reporting period. <br />A total of 1280 feet of Primary underdrain has been completed. <br />Temporary Underdrain: Temporary underdrain pipe is installed thru the embankment. No other work occurred <br />during this reporting period. <br />Tree /Slash Clearing, Chipping: <br />Seed Masters resumed operations during this reporting period and is expected to continue chipping stockpiled trees and slash <br />within the VLF area. <br />B) Underground Workings <br />Confirmatory drilling was not performed during this reporting period.. <br />During this reporting period exploratory excavation was performed on UG working No. 6146, No. 6188, No. 6193, <br />No. 6196, No. 6204, and No. 6205. Sites listed continued further investigation excavation into bedrock as <br />remediation continues or completed during the reporting period as specified. <br />It should be noted: A total of 30 underground workings were located within the previously graded slope from "E" <br />bench, 9650 elevation to the west perimeter road. 29 of the workings were shallow workings and were removed <br />during the site grading consisting of cut and are considered remediated. One working will be evaluated as the <br />working is described as a timbered shaft. <br />A walk through of the planned Phase 2 Diversion ditch was conducted to locate potential workings, which may <br />require remediation. <br />During this reporting period remediation efforts were performed and completed on UG working No.6147, No. 6187, <br />No. 6193, No. 6206, No. 6238 and No. 6239. Sites listed were excavated to practical refusal into rock varying <br />depths depending on the working remediated. The site for each working was then backfilled in 2 foot loose lifts to <br />approximate planned subgrade elevation using the onsite structural fill (excavated material) and "bucket tamped" <br />with the back of the CAT 330 excavator bucket. All backfill material was free of organic material, ice and snow and <br />are considered remediated as specified. <br />Q Highway 67 <br />Page 2 of 5 MLE2 WE 07.20.13.doc <br />