2013-08-23_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2013-08-23_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:24:09 PM
Creation date
8/27/2013 9:04:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/23/2013
Doc Name
Weekly CQA Reports- 7/20, 7/27, 8/3 and 8/10/2013.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"M <br />It should be noted, working No.U6263 received a concrete plug and completed with an approved cemented rock <br />fill. In addition UG working No. 6122 was completed with three layers of Geogrid. <br />C) Highway 67 <br />Fill continued to be hauled to the southern portion of the Highway 67 embankment using several Cat 777 haul <br />trucks and several Cat 740 haul trucks. The Northern portion of the embankment appears to be close to fill grade. <br />The structural fill material was placed in an approximately 18 to 24 inch lifts by Cat D10R, John Deere 1050 and <br />Cat D8R Dozers. The Cat CS56B vibratory, 10 -ton, smooth-drum roller completed the minimum of four passes <br />(Method Specification Applies) over each lift surface placed. It should be noted: haul trucks, loaded and unloaded, <br />drove over the backfill surface contributing to the overall compaction of the lift. In addition a Cat 330B excavator <br />equipped with a jackhammer (hammer hoe) broke up the oversize material encountered. <br />A GPS dozer was observed slope contouring the western downstream slope of the embankment and is expected <br />to continue. <br />It) Storm Water Management <br />Best Management Practices (BMP) are being performed. During the reporting period due to recent rains the <br />contractor was observed clearing roadways, draining areas of standing water and cleaning out collection sumps. <br />Erosion control efforts took place during this reporting period. <br />CQA ACTIVITIES: <br />1) Field Activities: Observation of construction activities, production drilling, Cut to Fill ADR Haul Road (HR), HWY 67 <br />embankment fill PSSA Toe Berm Fill placement and compaction, Underground remediation and field sampling were <br />performed during this reporting period as required per project specifications. <br />In Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture - Density, gradations and material classification and identifications and material sampling were performed during <br />this reporting period as required. <br />LVSCF sample No.'s 57 thru 65 were obtained during this reporting period. Results will be forwarded upon completion. <br />Total Tons: 183,541 <br />General Proiect Items <br />Meetings and Discussions: Weekly Project Status meeting was held at 10:00am on August 61h between CC &V, Ames, <br />CDOT and Amec. Topics discussed were Safety, Schedule, Project Issues, concerns and planning. <br />Summary of Concerns: None <br />CC& V. Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, Amec and Ames. <br />Miscellaneous: None <br />Deliveries: None <br />CQA Monitor <br />Submitted by: <br />Thorne M Clark <br />Project Resident Manager <br />Ph: 970.846.9337 <br />Approved By: <br />Date: -1---L� <br />Page 3 of 6 MLE2 WE 08.10.13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.