My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-08-23_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2013-08-23_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:24:09 PM
Creation date
8/27/2013 9:04:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/23/2013
Doc Name
Weekly CQA Reports- 7/20, 7/27, 8/3 and 8/10/2013.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T-Wilm, <br />CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />Squaw Gulch (VLF), HWY 67 Realignment Field Monitoring Summary Weekly Report <br />Owner. Cripple Creek & Victor Gold Mining Co. Project Number: Date <br />Project: Squaw Gulch (VLF), Hwy 67 Realignment 74201125N0. * * * *. * * ** 08.10.2013 <br />Location: Cripple Creek & Victor Gold Mine, Colorado <br />Contractor: Ames Construction Co. Inc. <br />Reporting Period: 08.04.13 thru 08.10.13 <br />Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />- <br />D <br />D <br />D <br />D <br />D <br />D <br />- <br />w <br />N <br />N <br />N <br />w <br />N <br />D = Day Shift N = Night Shift <br />w = Weather <br />Day <br />fllr, -fin1`� <br />DIVISION OF RFmAMATIORI <br />MINING AND SAFFiY <br />Ambient Temperature Ranges for reporting period: Weather conditions for revortine period: <br />Low: 387 — 521 ; Cloud Cover: Clear / partly Cloudy /Cloudy <br />High: 55T — 72 °F i Precipitation: P.M. Rain <br />! Wind: Calm to Gusts at times <br />Ames: Reporting a delay start Monday the 5`h and Tuesday the 6u' due to site conditions caused by recent rains, <br />Wednesday 7"' and Thursday the 9`h construction activities were paused or slowed due to weather conditions <br />during the afternoon shifts. Monday the 5 "' no night shift occurred due to rainy weather conditions. <br />Erosion control, access road and haul road clean up took place throughout the reporting period due to site <br />conditions, caused by recent rains. <br />Saturday the 10"' it should be noted; crusher operations have paused production due to a new belt line being <br />installed. It is anticipated production will resume during the next reporting period. <br />Amec: None <br />Project Issues: None <br />Planning: Continuing Construction activities and scheduling for VLF and HWY 67. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />1) Earthworks <br />A) VLF (Phase n <br />Topsoil Stripping: Organic material and debris was removed from the southern existing HWY 67 embankment during this <br />reporting period. Material removed was hauled to the topsoil stockpile 34 utilizing several 740 haul trucks. In addition to the <br />topsoil removed from the existing Hwy area, additional topsoil material was removed and stockpiled for future haul at the mid- <br />way area Approximate ADR HR STA. 44 +00 — 50 +00. <br />Production drilling was performed during this reporting period near design bench "E" and "DD" within the limits of <br />the VLF and at the south crib wall location. Production drilling is expected to continue. <br />Five production blasts' occurred during this reporting period within planned VLF Phase I limit's and at the South <br />Crib Wall location. Material generated as "cut" material generated structural fill using several Cat dozers and <br />transported by several Cat 777 and 740 haul trucks to be used for the HWY 67 embankment fill. <br />Page 1 of 6 MLE2 WE 08.10.13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.