My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-08-23_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2013-08-23_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:24:09 PM
Creation date
8/27/2013 9:04:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/23/2013
Doc Name
Weekly CQA Reports- 7/20, 7/27, 8/3 and 8/10/2013.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />Squaw Gulch (VLF), HWY 67 Realignment Field Monitoring Summary Weekly Report <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Number: Date <br />Project: Squaw Gulch (VLF), Hwy 67 Realignment 74201125NO. * * * *. * * ** 08.03.2013 <br />Location: Cripple Creek & Victor Gold Mine, Colorado <br />Contractor: Ames Construction Co. Inc. <br />Reporting Period: 07.28.13 thru 08.03.13 <br />Days S <br />S M <br />M T <br />T W <br />W T <br />T F <br />F S <br />S <br />Work Shifts - <br />- D <br />D D <br />D D <br />D D <br />D D <br />D D <br />D <br />N N <br />N N <br />N N <br />N N <br />N N <br />N <br />D = Day Shift N = Night Shift W <br />W = Weather D <br />Day- <br />?0 13 <br />bIVISION OF REC.4M4710N <br />MINING AND SAFEry <br />Ambient Temperature Ranges for reporting period: I Weather conditions for reporting period: <br />Low: 45 °F — 50 °F Cloud Cover: Clear/ partly Cloudy <br />High: 67 °F — 76 °F Precipitation: P.M. Light Rain/Mostly Zero Precip. <br />Wind: Calm to Gusts at times <br />i <br />Ames: Monday July 29`h construction progress was limited due to previous day's rains. Erosion control, access <br />road and haul road clean up was the majority of the work performed on the 29th. <br />Amec: None <br />Project Issues: None <br />Planning: Continuing Construction activities and scheduling for VLF and HWY 67. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />1) Earthworks <br />A) VLF (Phase I) <br />Topsoil Stripping: Organic material and debris was removed from the slopes of the existing HWY 67 embankment fill during <br />this reporting period. Material removed was hauled to the designated topsoil stockpile utilizing several 740 haul trucks. In <br />addition to the topsoil removed from the existing Hwy, additional topsoil material was removed and stockpiled for future haul at <br />the mid -way. <br />Production drilling was performed during this reporting period near design bench "E" within the limits of the VLF, <br />the planned PSSA floor and at the south crib wall location. Production drilling is expected to continue. <br />Six production blasts' occurred during this reporting period within planned VLF Phase I limit's, South Crib Wall <br />location and within the PSSA floor limits. Material generated as "cut" material generated structural fill using several <br />Cat dozers and transported by several Cat 777 and 740 haul trucks to be used for the HWY 67 embankment fill. <br />Structural Fill: Structural fill began to be hauled to the PSSA toe berm area widening the haul road, using several <br />Cat 777 and several 740 haul trucks. The structural fill material was placed in an approximately 18 to 24 inch loose <br />lifts by a John Deere 1050) and D10R dozers followed by a Cat CS56B vibratory, 10 -ton, smooth-drum roller that <br />compacted the placed materials with a minimum of four passes (By method specification). <br />Page I of 6 MLE2 WE 08.03.13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.