My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-08-21_REVISION - M1977283
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977283
>
2013-08-21_REVISION - M1977283
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:51:43 PM
Creation date
8/27/2013 8:46:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977283
IBM Index Class Name
REVISION
Doc Date
8/21/2013
Doc Name
Response to Adequacy Letter
From
GEI
To
DRMS
Type & Sequence
TR1
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(T0 )tCLhnical August 13, 2013 <br />F_n%uonm,�nt,iI <br />\ \a[ei Reu�ur�eti <br />Fcol„�Ttc.rl <br />RECEIVED <br />?013 <br />DIVISION OF RECLAMATION <br />MINING AND SAFEfy <br />Mr. Tom Kaldenbach <br />/Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street Room 215 <br />Denver, CO 80203 <br />303 - 866 -3567 <br />G E I� <br />Re: "Response to Adequacy Letter <br />Re: Technical Revision #1 — Debetz Sand and Gravel Pit, Adams County <br />Colorado — Mine Permit No. M- 1977283 <br />v <br />Dear Mr. Kaldenbach: <br />On behalf of the Adams County Parks and Community Resources Department, GEI <br />Consultants is providing the following information in response to your adequacy <br />letter dated July 29, 2013. <br />1) Please provide the required notice prior to importing f ll in accordance with <br />Rule 3.1.5(9). <br />a. See Attachment 1. <br />2) Please submit a revised reclamation plan in accordance with Rule 6.4.5. <br />a. The revised reclamation plan will be implemented in general <br />accordance with the originally approved reclamation plan (April <br />1978) and in accordance with the Adams County Regional Park <br />Master Plan (February 2008). The revised reclamation plan is <br />proposed to be in compliance with the stated goals of the original <br />reclamation plan. Namely that the revised reclamation plan is, <br />"...designed to complement the surrounding area where recreation <br />and open space are currently the predominant land uses." <br />More specifically, the revised reclamation plan will include grading <br />the disturbed areas in compliance with the Mining Safety and Health <br />Administration regulations. Topsoil will be replaced in disturbed <br />areas at a depth ranging from three to six inches. The topsoil will be <br />sampled prior to developing a fertilization plan and Adams County <br />may consider using a bio solid compost fertilizer instead of (or in <br />" % setc,,multants corn <br />GEI Consultants, Inc <br />1601 DTC Boulevard, Suite 900, Demer, CO 80237 <br />303 662 0101) fax 303 662.8757 <br />
The URL can be used to link to this page
Your browser does not support the video tag.