My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-08-16_PERMIT FILE - M2013054
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2013054
>
2013-08-16_PERMIT FILE - M2013054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:23:51 PM
Creation date
8/22/2013 8:48:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013054
IBM Index Class Name
PERMIT FILE
Doc Date
8/16/2013
Doc Name
New Application
From
Boyce Land & Cattle Co., LLC
To
DRMS
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br />Mining Plan <br />COTTON CREEK PIT <br />The mining operation will be limited in scope with an estimated 30 -year mine life. <br />Mining will proceed slowly, with very few acres being disturbed initially, <br />allowing the operator to test the market needs of his material without disturbing <br />more ground than necessary. <br />The proposed plan of operation of this site is as follows: <br />1. The native brush and grass will be removed from approximately 5 acres. <br />2. The topsoil will be stripped to a depth of 0.5 foot to 1 foot on the opened <br />ground and will be stockpiled within the site. <br />3. Gravel and sand will be excavated as per demand. The bottom of the pit will <br />remain above the ground water table, the exact elevation of which is unknown <br />by the operator at this time. <br />4. As the mining operation approaches the edge of the pit, the sides will be <br />excavated on a 3:1 slope (or flatter) so that the excavation will also produce <br />the final grade for reclamation for the pit. <br />5. As the mine enlarges, topsoil will be removed and stockpiled. At the point that <br />it is reasonable for the operator, he will begin replacement of the topsoil over <br />the area of the pit that is at final grade. <br />6. Once an area has been placed at final grade and topsoil replaced, it will be <br />reseeded as per the Natural Resource Conservation Service recommendations <br />(see attached letter). <br />7. When the mine has been completed, mining activity will cease and all <br />reseeding and topsoil replacement will be completed. <br />8. The mine will cease operation and will apply to the MLRB for closure. <br />A road will be built from County Road CC to the site. This road will provide the <br />owner /farmer with access to his field as well as access for the operator to the <br />mine. <br />There will not be any toxic or hazardous by- products from this operation. <br />0 <br />AUU 16 2013 <br />DURANGO FIELD OFFICE <br />DIVISION OF RECLAMATION, <br />MINING AND SAFETY <br />
The URL can be used to link to this page
Your browser does not support the video tag.