Laserfiche WebLink
Page 6 of 129 <br />TRUCK/LOADER TEAM WORK <br />Task description: Haul Backfill Material from Utility Pad Area to Portal Face -Up <br />Site: Peabody Sage Creek Mine Permit Action: 2013 Midterm Review Permit /Job#: C2009087 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 2/4/2013 County_ : Routt <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />i <br />Trick Loader Team - Truck: Cat 769D <br />- Loader: CAT 988H <br />Support Equipment -Load Area: Cat D10T - 10SU <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Trick: I Water Tanker. 10.000 Gal. <br />Abbreviation: None <br />Filename: C087 -002 <br />Shift basis: Ipr day <br />Cost Breakdown: Truck/Loader Team Sunnort Equipment Maintenance Eauunment <br />Total u-, ork team cost/hour: $2,076.90 <br />MATERIAL OUANTITIES <br />Initial volume: 183.389 CCY Swell factor: 1.125 <br />Loose volume: 206,313 LCY <br />Source of estimated volume: Division of Reclamation. M_ inin_g_ X_�_ Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Caoacitv: <br />Truck Payload (weight) Basis: <br />Material weight: 2.650 <br />Description: Decom <br />Rated Payload: 82.000 <br />Payload Capacity: 30.94 <br />Pounds/LCY <br />rock - 25% Rock. 75% Earth <br />Pounds <br />LCY <br />CIRCES Cost Estimating Soft%%are <br />Trick <br />Loader Load Area Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization - machine: <br />100 <br />95 100 NA <br />NA <br />25 <br />Ownership cost /hour: <br />$=41.57 <br />$82.23 $99.15 NA <br />NA <br />$52.97 <br />Operating cost /hour: <br />$93.68 <br />$111.17 $183.36 NA <br />NA <br />$29.77 <br />Ripper op. cost /hour: <br />NA <br />$0.00 $0.00 NA <br />NA <br />$0.00 <br />Operator cost /hour: <br />$25.66 <br />$35.82 $37.41 NA <br />NA <br />$21.17 <br />Unit Subtotals: <br />$160.90 <br />$229.22 $319.93 NA <br />NA <br />$103.91 <br />Number of Units: <br />6 <br />3 <br />1 0 <br />0 <br />1 <br />Group Subtotals: <br />Work: $1.653.06 <br />Support: $319.93 <br />Maimt: $103.91 <br />Total u-, ork team cost/hour: $2,076.90 <br />MATERIAL OUANTITIES <br />Initial volume: 183.389 CCY Swell factor: 1.125 <br />Loose volume: 206,313 LCY <br />Source of estimated volume: Division of Reclamation. M_ inin_g_ X_�_ Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Caoacitv: <br />Truck Payload (weight) Basis: <br />Material weight: 2.650 <br />Description: Decom <br />Rated Payload: 82.000 <br />Payload Capacity: 30.94 <br />Pounds/LCY <br />rock - 25% Rock. 75% Earth <br />Pounds <br />LCY <br />CIRCES Cost Estimating Soft%%are <br />