Laserfiche WebLink
Page 5 of 129 <br />Han] Route: <br />Seg # <br />Haul Distance <br />Grade ( o <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />minutes <br />(Ft) <br />1 <br />N <br />( %) <br />(fpm) <br />Time <br />0.572 <br />673.46 LCY/Hour <br />Truck Unit Production <br />l <br />950.00 <br />- 5.00 <br />3.00 <br />-2.00 <br />3893 <br />0.294 <br />Haul Time: <br />Return Route: <br />0.294 <br />minutes <br />CIRCES Cost Estimating Sotl«are <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res Total Res <br />( %) ( %) <br />Velocity <br />(fpm) <br />Travel <br />Tune <br />(min) <br />minutes <br />Loading Tool unit <br />1 <br />950.00 <br />5.00 <br />3.00 8.00 <br />2120 <br />0.572 <br />673.46 LCY/Hour <br />Truck Unit Production <br />CIRCES Cost Estimating Sotl«are <br />Return Time: 0.572 <br />minutes <br />Total Truck Cycle Time: 4.111 <br />minutes <br />Loading Tool unit <br />Production <br />811.40 <br />LCY/Hour Adjusted for job efficiency: <br />673.46 LCY/Hour <br />Truck Unit Production <br />443.10 <br />LCY/Hour Adjusted for job efficiency: <br />367.78 LCY/Hour <br />Optimal No. of Trucks: <br />2 <br />Truck-(s) Selected Number of Trucks: <br />2 Trick(s) <br />Adjusted hourly trick team production: 735.55 <br />LCY/Hour <br />Adjusted single truck/loader team production: 673.46 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 1,346.93 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />2 <br />Team(s) Total job time: 243.07 <br />Hours <br />Unit cost: <br />$1.133 <br />/LCY Total job cost: $370,891.18 <br />CIRCES Cost Estimating Sotl«are <br />