Laserfiche WebLink
TRUCK/LOADER TEAM WORK <br />Task description: - Remove Gravel from North Facilities Parking Area - <br />Site: Peabody Sage Creek Mine Permit Action: 2013 Midterm Review Pennit/Job#: C2009087 <br />PROJECT IDENTIFICATION <br />Task #: 020 State: Colorado <br />Date: 2/4/2013 County: Routt <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: <br />- Loader: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Cost Breakdown: Tnick/Loader Team <br />Abbreviation: None <br />Filename: C087 -020 <br />Shift basis: 1 per day <br />Cat 769D <br />CAT 988H <br />NA <br />NA <br />CAT 1-4M <br />Water Tanker. 10.000 Gal. <br />Snnnort Fnuinment <br />Maintenance Fnitinment <br />Total «ork team cost/hour: $1,380.99 <br />MATERIAL OUANTITIES <br />Initial volume: 4.195 CCY Swell factor: 1.090 <br />Loose volume: 4,573 LCY <br />Source of estimated volume: Division of Reclamation. Mining cot SafetN' <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,400 Pounds/LCY <br />Description: Clay- and gravel - Dry <br />Rated Payload: 82.000 Pounds <br />Payload Capacity: 34.17 LCY <br />Truck <br />Loader Load Area Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization - machine: <br />100 <br />95 NA <br />NA <br />25 <br />25 <br />Ownership cost /hour: <br />Operating cost /hour: <br />$41.57 <br />$82.23 <br />$111.17 <br />NA <br />NA <br />NA <br />NA <br />$37.98 <br />$16.9.4 <br />$52.97 <br />$29.77 <br />$93.68 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost /hour: <br />$25.66 <br />$35.82 <br />NA <br />NA <br />$27.55 <br />$21.17 <br />Unit Subtotals: <br />$160.90 <br />$229.22 <br />NA <br />NA <br />$82.46 <br />$103.91 <br />Number of Units: <br />6 <br />1 <br />0 0 <br />1 <br />1 <br />Group Subtotals: <br />Work: $1.194.62 <br />Support: $0.00 <br />Maint: $186.37 <br />Total «ork team cost/hour: $1,380.99 <br />MATERIAL OUANTITIES <br />Initial volume: 4.195 CCY Swell factor: 1.090 <br />Loose volume: 4,573 LCY <br />Source of estimated volume: Division of Reclamation. Mining cot SafetN' <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,400 Pounds/LCY <br />Description: Clay- and gravel - Dry <br />Rated Payload: 82.000 Pounds <br />Payload Capacity: 34.17 LCY <br />