Laserfiche WebLink
Visibility: <br />1.000 <br />(AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />0.800 <br />(FND -RF) <br />Push gradient: <br />1.000 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />0.868 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.3890 <br />Adjusted unit production: 544.60 LCY/hr <br />Adjusted fleet production: 544.6 LCY/lir <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.387/LCY <br />Total job time: 1.94 Hours <br />Total job cost: $410.17 <br />Page 22 of 129 <br />CIRCES Cost Estimating Soft«are <br />