Laserfiche WebLink
Exhibit D <br />Reclamation Plan: Partial reclamation will occur at the end of each mining season during mining <br />operations as is feasible. All excavations including, trenches and pits will be back filled with stock piled <br />over burden and topsoil. All slopes will be contoured and graded to pre mining status. The disturbed <br />areas will be broadcasted with 40 Ibs of seed mix per acre as recommended by the Forest Service. No <br />live trees will be disturbed at this mining operation, but new pines will be planted as so many were <br />destroyed by the Hayman fire of 2002. <br />Exhibit F <br />List of other Permits and Licenses Required: <br />Environmental Assessment -USDA USFS <br />Plan of Operation -USDA USFS <br />Exhibit G <br />Legal Right to Enter : See the attached claim notice and receipt for the most recent payment on <br />the claim to the Bureau of Land Management. <br />Exhibit H <br />Municipalities: There are no towns or cities within a 2 -mile radius of the claim site. The closest <br />town is LakeGeorge, 6 miles south. <br />Exhibit I <br />Poof of Filing with the Teller County Clerk: (see attached) <br />Exhibit J <br />Proof of Mailing Notices to the Teller County Commissioners and Soil Conservation District: (see <br />attached). <br />Exhibit( L <br />Permanent Man -Made Structures: There are no permanent man —made structures within 200 <br />feet of the site. <br />