Laserfiche WebLink
ce��r COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />yQ. 8 MINERALS PROGRAM INSPECTION REPORT <br />'� PHONE: (303) 866 -3567 <br />*,ass <br />The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br />noted below. This report documents observations concerning compliance with the terms of the permit <br />and applicable rules and regulations of the Mined Land Reclamation Board. <br />MINE NAME: <br />MINE /PROSPECTING ID #: <br />MINERAL: <br />COUNTY: <br />25th Avenue Site <br />M- 2002 -020 <br />Sand and gravel <br />Weld <br />INSPECTION TYPE: <br />INSPECTOR(S): <br />INSP. DATE: <br />INSP. TIME: <br />Monitoring <br />Peter S. Hays <br />July 24, 2013 <br />10:00 <br />OPERATOR: <br />OPERATOR REPRESENTATIVE: <br />TYPE OF OPERATION: <br />City of Greeley <br />Bill Schenderlein — Blue Earth <br />112c -Construction Regular Operation <br />REASON FOR INSPECTION: <br />BOND CALCULATION TYPE: <br />BOND AMOUNT: <br />Citizen Complaint <br />None <br />$0.00 <br />DATE OF COMPLAINT: <br />POST INS NTACT <br />JOINT INSP. AGENCY: <br />7/3/13 <br />None <br />None <br />WEATHER: <br />INSP O S SI ATURE: <br />SIGNATURE DATE: <br />Clear <br />August 1, 2013 <br />The following inspection topics were identified as having Problems or Possible Violations. OPERATORS <br />SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br />Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br />Reclamation Board will consider possible enforcement action. <br />INSPECTION TOPIC: Hydrologic Balance <br />PROBLEM /POSSIBLE VIOLATION: Problem: The dewatering activity at the site has caused disturbances to the <br />prevailing hydrologic balance of the surrounding area and to the quantity of water in the groundwater system. <br />CORRECTIVE ACTIONS: The City must implement the approved mitigation plan for the site and must submit a <br />plan to provide a short-term solution of the problem within 15 days and implement the plan within 45 days of <br />the mailing date of this inspection report. <br />CORRECTIVE ACTION DUE DATE: 8/16/13 and 9/15/13 <br />INSPECTION TOPIC: Hydrologic Balance <br />PROBLEM /POSSIBLE VIOLATION: Problem: The dewatering activity at the site has caused disturbances to the <br />prevailing hydrologic balance of the surrounding area and to the quantity of water in the groundwater system. <br />CORRECTIVE ACTIONS: The City must implement the approved mitigation plan for the site and provide the <br />Division with a plan to provide a long -term solution of the problem within 60 days of the date of this inspection <br />report. <br />CORRECTIVE ACTION DUE DATE: 9/30/13 <br />Page 1 of 7 <br />