June 19,2013 C-1980-007/West Elk Mine JRS <br /> been placed on the reclaimed pad to help control erosion. There was a lot of good first-year vegetative growth on <br /> the pad,with perennial grasses and forbs present. Although not a Phase I Bond Release criterion,all of the <br /> stripped topsoil has been replaced on the drill pad. No topsoil depth measurements were taken as all stripped <br /> topsoil on a drill pad is stockpiled on site and replaced on that site following backfilling and regrading. The site <br /> was fenced with electric fence to keep cattle and wildlife off of the reclamation until it is further stabilized. <br /> Overall,the reclamation on this drill pad was excellent and completed in accordance with the approved <br /> reclamation plan. <br /> -The drill pad for MDW E1-34 was reclaimed and well graded. The site was blended well with the adjacent <br /> undisturbed areas. There was no settling,cracking or slumping observed on the pile at the time of the inspection. <br /> The site was graded to allow for positive drainage and no low spots were observed. There were no erosional <br /> problems noted on the pad and no sediment was observed in the undisturbed areas. This site was reclaimed in <br /> 2011, so it is in its second year of growth(versus the majority of the other pads,except E1-38,which were <br /> reclaimed in 2012). The vegetative cover was excellent at this point,with good perennial grass and forb cover. <br /> There was some hound's tongue and bind weed observed on the site,which will need to be sprayed. Although not <br /> a Phase I Bond Release criterion, all of the stripped topsoil has been replaced on the drill pad. No topsoil depth <br /> measurements were taken as all stripped topsoil on a drill pad is stockpiled on site and replaced on that site <br /> following backfilling and regrading. The site was not fenced like most of the other El pad sites. Overall,the <br /> reclamation on this drill pad was excellent and completed in accordance with the approved reclamation plan. <br /> -The drill pad for MDW E1-38 was reclaimed and well graded. The site was blended well with the adjacent <br /> undisturbed areas. There was no settling,cracking or slumping observed on the pile at the time of the inspection. <br /> The site was graded to allow for positive drainage and no low spots were observed. There were no erosional <br /> problems noted on the pad and no sediment was observed in the undisturbed areas. This site was reclaimed in <br /> 2011, so it is in its second year of growth(versus the majority of the other pads,except E1-34,which were <br /> reclaimed in 2012). The vegetative cover was excellent at this point,with good perennial grass and forb cover. <br /> There was some Canadian thistle observed on the site,which will need to be sprayed. Although not a Phase I <br /> Bond Release criterion, all of the stripped topsoil has been replaced on the drill pad. No topsoil depth <br /> measurements were taken as all stripped topsoil on a drill pad is stockpiled on site and replaced on that site <br /> following backfilling and regrading. The site was fenced with a barbed wire fence and not an electric fence,like <br /> most of the other E1 pad sites. Overall,the reclamation on this drill pad was excellent and completed in <br /> accordance with the approved reclamation plan. <br /> - The drill pad for MDW E1-45 was reclaimed and well graded. The site was blended well with the adjacent <br /> undisturbed areas. There was no settling,cracking or slumping observed on the pile at the time of the inspection. <br /> The site was graded to allow for positive drainage and no low spots were observed. There were no erosional <br /> problems noted on the pad and no sediment was observed in the undisturbed areas. The slash from the original <br /> construction has been placed on the reclaimed pad to help control erosion. There was a lot of good first-year <br /> vegetative growth on the pad,with perennial grasses and forbs present. There was some hound's tongue observed <br /> on the pad,which will need to be sprayed. Although not a Phase I Bond Release criterion, all of the stripped <br /> topsoil has been replaced on the drill pad. No topsoil depth measurements were taken as all stripped topsoil on a <br /> drill pad is stockpiled on site and replaced on that site following backfilling and regrading. The site was fenced <br /> with electric fence to keep cattle and wildlife off of the reclamation until it is further stabilized. Overall,the <br /> reclamation on this drill pad was excellent and completed in accordance with the approved reclamation plan. <br /> -The Drill pad for MDW EI-08 was reclaimed and well graded and stable at the time of the inspection. The drill <br /> Number of Partial Inspection this Fiscal Year: 9 <br /> Number of Complete Inspections this Fiscal Year: 4 <br /> Page 6 of 53 <br />