Laserfiche WebLink
J &T Consulting, Inc. GP Aggregates LLC <br />FReclamation West Farm PI <br />7/26/2013 <br />Bond Quantities and Costs tP <br />Conndttn` Im 07115 GP Aggregates Re Bond Calm TR2 <br />Phase 13 (11.61 acres) <br />lKeciamation uperation <br />uuantiry <br />unit <br />unit <br />cost <br />cost <br />Active Mining Area <br />Credit for Slurry Wall Required to Close Phases 5 -12 (60' avg Depth) <br />(6,684) <br />If <br />$ <br />190 <br />$ (1,269,960) <br />Credit for Topsoil Area Above Water Required for Phases 1 -12 <br />(8 5) <br />ac <br />$ <br />2,000 <br />$ (17,051) <br />Credit for Revegetated Area Above Water Required for Phases 1 -12 <br />(8 5) <br />ac <br />$ <br />1,000 <br />$ (8,525) <br />Slurry Wall Required to Close Phases 5 -13 (60' avg Depth) <br />8,502 <br />If <br />$ <br />190 <br />$ 1,615,380 <br />Topsoil Area Above Water Required for Phases 1 -13 <br />101 <br />ac <br />$ <br />2,000 <br />$ 20,252 <br />Revegetate Area Above Water Required for Phases 1 -13 <br />101 <br />ac <br />$ <br />1,000 <br />$ 10,126 <br />Dewatering of Full Pit for Phase 13 <br />1262 <br />Mil. Gal. <br />$ <br />350 <br />$ 44,170 <br />Mobilization <br />1.00 <br />Is <br />$ <br />2,500 <br />$ 2,500 <br />Total Direct Cost <br />$ 396,892 <br />Overhead and Profit <br />Cost (12.60 %) <br />$ 50,008 <br />Contract Cost <br />$ 446,900 <br />Project Management (9.25 %) $ 36,712 <br />Additional Financial Warranty Required For Phase 13 $ 483,612 <br />Phase 14 (11.56 acres) <br />111eciamation uperation <br />uuannty <br />unit <br />unit <br />cost <br />cost <br />Active Mining Area <br />Slurry Wall Required to Close Phase 14 (50' avg Depth) <br />2,895 <br />If <br />$ <br />150 <br />$ 434,250 <br />Topsoil Area Above Water Required for Phase 14 <br />2.7 <br />ac <br />$ <br />2,000 <br />$ 5,317 <br />Revegetate Area Above Water Required for Phase 14 <br />2.7 <br />ac <br />$ <br />1,000 <br />$ 2,658 <br />Dewatering of Full Pit for Phase 14 <br />160.2 <br />Mil Gal. <br />$ <br />350 <br />$ 56,057 <br />Mobilization <br />1.00 <br />Is <br />$ <br />2,500 <br />$ 2,500 <br />Revegetate Area Above Water Required for Phases 14 -15 <br />4.2 <br />Total Direct Cost <br />$ 500,783 <br />Overhead and Profit Cost (12.60 %) $ 63,099 <br />Contract Cost $ 563,881 <br />Protect Management (9 25 %) $ 46,322 <br />Additional Financial Warranty Required For Phase 14 $ 610,204 <br />Phase 15 (11 52 acres) <br />111eciamation uperation <br />uuantiry <br />unit <br />unit <br />cost <br />cost <br />Active Mining Are a <br />Credit for Slurry Wall Required to Close Phase 14 (50' avg Depth) <br />(2,895) <br />If <br />$ <br />150 <br />$ (434,250) <br />Credit for Topsoil Area Above Water Required for Phase 14 <br />(2 7) <br />ac <br />$ <br />2,000 <br />$ (5,317) <br />Credit for Revegetated Area Above Water Required for Phase 14 <br />(2.7) <br />ac <br />$ <br />1,000 <br />$ (2,658) <br />Slurry Wall Required to Close Phases 14 -15 (50' avg Depth) <br />4,666 <br />If <br />$ <br />150 <br />$ 699,900 <br />Topsoil Area Above Water Required for Phases 14 -15 <br />4.2 <br />ac <br />$ <br />2,000 <br />$ 8,481 <br />Revegetate Area Above Water Required for Phases 14 -15 <br />4.2 <br />ac <br />$ <br />1,000 <br />$ 4,241 <br />Dewatering of Full Pit for Phase 15 <br />144.5 <br />Mil. Gal. <br />$ <br />350 <br />$ 50,574 <br />Mobilization <br />100 <br />Is <br />$ <br />2,500 <br />$ 2,500 <br />Total Direct Cost <br />$ 323,470 <br />Overhead and Profit Cost (12 60 %) $ 40,757 <br />Contract Cost $ 364,227 <br />Project Management (9 25 %) $ 29,921 <br />Additional Financial Warranty Required For Phase 15 $ 394,148 <br />6of7 <br />