Laserfiche WebLink
J &T Consulting, Inc. GP Aggregates LLC <br />FUT West Farm Pit <br />7/26/2013 <br />Bond Quantities and Costs tp <br />Consultim In c. <br />07115 GP Aggregates Rec Bond Calca T112 <br />Phase 10 (9.36 acres) <br />111eciamauon uperavon <br />wuanury <br />unit <br />unit <br />cost <br />cost <br />Active Mining Are a <br />$ <br />1,269,960 <br />2,000 <br />$ <br />17,051 <br />Credit for Slurry Wall Required to Close Phases 5 -9 (65' avg Depth) <br />(5,334) <br />If <br />$ <br />210 <br />$ (1,120,140) <br />Credit for Topsoil Area Above Water Required for Phases 1 -9 <br />(7.3) <br />ac <br />$ <br />2,000 <br />$ (14,527) <br />Credit for Revegetated Area Above Water Required for Phases 1 -9 <br />(7.3) <br />ac <br />$ <br />1,000 <br />$ (7,264) <br />Slurry Wall Required to Close Phases 5 -10 (60' avg Depth) <br />6,312 <br />If <br />$ <br />190 <br />$ 1,199,280 <br />Topsoil Area Above Water Required for Phases 1 -10 <br />8.2 <br />ac <br />$ <br />2,000 <br />$ 16,325 <br />Revegetate Area Above Water Required for Phases 1 -10 <br />8.2 <br />ac <br />$ <br />1,000 <br />$ 8,163 <br />Dewatering of Full Pit for Phase 10 <br />144.5 <br />Mil. Gal. <br />$ <br />350 <br />$ 50,574 <br />Mobilization <br />1.00 <br />Is <br />$ <br />2,500 <br />$ 2,500 <br />Total Direct Cost <br />$ 134,911 <br />Overhead and Profit Cost (12 60 %) $ 16,999 <br />Contract Cost $ 151,909 <br />Project Management (9.25%) $ 12,479 <br />Additional Financial Warranty Required For Phase 10 $ 164,389 <br />Phase 11 (9.75 acres) <br />111eciamation uperation <br />uuantiry <br />unit <br />unit <br />cost <br />cost <br />Active Mining Area <br />$ <br />1,269,960 <br />2,000 <br />$ <br />17,051 <br />Credit for Slurry Wall Required to Close Phases 5 -10 (60' avg Depth) <br />(6,312) <br />If <br />$ <br />190 <br />$ (1,199,280) <br />Credit for Topsoil Area Above Water Required for Phases 1 -10 <br />(8.2) <br />ac <br />$ <br />2,000 <br />$ (16,325) <br />Credit for Revegetated Area Above Water Required for Phases 1 -10 <br />(8.2) <br />ac <br />$ <br />1,000 <br />$ (8,163) <br />Slurry Wall Required to Close Phases 5 -11 (60' avg Depth) <br />6,323 <br />If <br />$ <br />190 <br />$ 1,201,370 <br />Topsoil Area Above Water Required for Phases 1 -11 <br />8.2 <br />ac <br />$ <br />2,000 <br />$ 16,345 <br />Revegetate Area Above Water Required for Phases 1 -11 <br />8.2 <br />ac <br />$ <br />1,000 <br />$ 8,173 <br />Dewatering of Full Pit for Phase 11 <br />150.9 <br />Mil Gal. <br />$ <br />350 <br />$ 52,803 <br />Mobilization <br />100 <br />Is <br />$ <br />2,500 <br />$ 2,500 <br />Total Direct Cost <br />$ 57,423 <br />Overhead and Profit Cost (12.60 %) $ 7,235 <br />Contract Cost $ 64,658 <br />Project Management (9 25 %) $ 5,312 <br />Additional Financial Warranty Required For Phase 11 $ 69,970 <br />Phase 12 (12.68 acres) <br />ec ama ion Operation Quantity Unit Unit Cost os <br />Active Minina Area <br />Credit for Slurry Wall Required to Close Phases 5 -11 (60' avg Depth) (6,323) If $ 190 $ (1,201,370) <br />Credit for Topsoil Area Above Water Required for Phases 1 -11 <br />Credit for Revegetated Area Above Water Required for Phases 1 -11 <br />Slurry Wall Required to Close Phases 5 -12 (60' avg Depth) <br />Topsoil Area Above Water Required for Phases 1 -12 <br />Revegetate Area Above Water Required for Phases 1 -12 <br />Dewatering of Full Pit for Phase 12 <br />(8 2) ac $ <br />(8 2) ac $ <br />6,684 If $ <br />8.5 ac $ <br />85 ac $ <br />153.4 Mil Gal $ <br />2,000 <br />$ <br />(16,345) <br />1,000 <br />$ <br />(8,173) <br />190 <br />$ <br />1,269,960 <br />2,000 <br />$ <br />17,051 <br />1,000 <br />$ <br />8,525 <br />350 <br />$ <br />53,684 <br />Mobilization 1.00 Is $ 2,500 $ 2,500 <br />Total Direct Cost $ 125,832 <br />Overhead and Profit Cost (12 60 %) $ 15,855 <br />Contract Cost $ 141,687 <br />Project Management (9.25%) $ 11,639 <br />Additional Financial Warranty Required For Phase 12 $ 153,327 <br />5 of 7 <br />