My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-07-25_REVISION - M2008078
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008078
>
2013-07-25_REVISION - M2008078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:22:54 PM
Creation date
7/30/2013 3:27:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008078
IBM Index Class Name
Revision
Doc Date
7/25/2013
Doc Name
GP Aggregates LLC West Farm Pit Technical Revison no 2 Request
From
J&T Consulting Inc
To
DRMS
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J &T Consulting, Inc. GP Aggregates LLC <br />id ' West Pit <br />7/26/22612 013 <br />Reclamation Bond Quantities and Costs tPy <br />© 2013 J&T Consulthm Im 07115 GP Aggregates Re Bond Calc TR2. <br />Summary of Unit Costs <br />uuannry <br />unit <br />unit <br />Direct costs <br />cost 1 <br />Active Mining Area (Surface only in PH 1 Area) <br />Scarifying Ground <br />$ <br />200 <br />/ acre <br />Re- applying topsoil 12" thick <br />$ <br />2,000 <br />/ acre <br />Revegetating disturbed area <br />$ <br />1,000 <br />/ acre <br />Dewatering full pit <br />$ <br />350 <br />/ million gallons <br />Mobilization <br />$ <br />2,500 <br />lump sum <br />Slurry Wall Cost Breakdown (0 -50 ft Ca) $3 /ft - 51 -70 ft (a) $4 /ft ) <br />Slurry Wall Cost (45 foot average depth) $ 135 / linear foot <br />Slurry Wall Cost (50 foot average depth) $ 150 / linear foot <br />Slurry Wall Cost (60 foot average depth) $ 190 / linear foot <br />Slurry Wall Cost (65 foot average depth) $ 210 / linear foot <br />Slurry Wall Cost (70 foot average depth) $ 230 / linear foot <br />Overhead and Profit Costs <br />Liability insurance 1.55% of direct cost <br />Performance bond 1.05% of direct cost <br />Profit 10.00% of direct cost <br />Total Overhead Cost 12.60% of direct cost <br />Project Management <br />Engineering and bidding 4.25% of direct cost <br />Management and administration 5.00% of direct cost <br />Total Additional Cost 9.25% of direct cost <br />Phase 1A (9.25 acres) (Limited to Surface Mining In PH 1 Area Above Groundwater Level) <br />lrteaamatton uperatton <br />uuannry <br />unit <br />unit <br />cost <br />cost 1 <br />Active Mining Area (Surface only in PH 1 Area) <br />Scarifying Ground in Disturbed Area <br />9.3 <br />ac <br />$ <br />200 <br />$ 1,860 <br />Topsoil Placement in Disturbed Area <br />9.3 <br />ac <br />$ <br />2,000 <br />$ 18,600 <br />Revegetate Disturbed Area <br />9.3 <br />ac <br />$ <br />1,000 <br />$ 9,300 <br />Scarifying Ground, Phases 1 -4 Slurry Wall Disturbance Area <br />5.0 <br />ac <br />$ <br />200 <br />$ 1,000 <br />Topsoil Placement, Phases 1 -4 Slurry Wall Disturbance Area <br />5.0 <br />ac <br />$ <br />2,000 <br />$ 10,000 <br />Revegetate, Phases 1 -4 Slurry Wall Disturbance Area <br />5.0 <br />ac <br />$ <br />1,000 <br />$ 5,000 <br />Plant Site Phase 18ITemporary Topsoil Stockpile Areas <br />Scarifying Ground in Plant Site Area <br />11.5 <br />ac <br />$ <br />200 <br />$ 2,300 <br />Topsoil Placement in Plant Site Area <br />11.5 <br />ac <br />$ <br />2,000 <br />$ 23,000 <br />Revegetate Plant Site Area <br />11.5 <br />ac <br />$ <br />1,000 <br />$ 11,500 <br />Scarifying Ground in Topsoil Stockpile Areas <br />2.8 <br />ac <br />$ <br />200 <br />$ 568 <br />Revegetate Topsoil Stockpile Areas <br />2.8 <br />ac <br />$ <br />1,000 <br />$ 2,840 <br />Mobilization <br />1.00 <br />Is <br />$ <br />2,500 <br />$ 2,500 <br />Total Direct Cost <br />$ 88,468 <br />Overhead and Profit Cost (12.60 %) $ 11,147 <br />Contract Cost $ 99,615 <br />Project Management (9.25 %) $ 8,183 <br />Total Required Financial Warranty For Phase 1A $ 107,798 <br />1 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.