My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-07-23_REVISION - M2012032 (10)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2013-07-23_REVISION - M2012032 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:51:42 PM
Creation date
7/29/2013 3:15:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
REVISION
Doc Date
7/23/2013
Doc Name
TR-01 SUBMITTAL
From
GREG LEWICKI & ASSOCIATES
To
DRMS
Type & Sequence
TR1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
freshly crushed on site to a size range of 1.5 inches minus. This material will be placed over the EPDM <br />liner to an approximate depth of 24 feet. The water movement through the waste rock will reduce the <br />zinc concentration in the water. At the bottom of the freshly cut waste rock, 3 perforated 8" diameter <br />DR -8 HDPE gathering pipes will collect water the mine water and deliver it to the designated mine water <br />pond. <br />In the event that the gathering pipes at the bottom of the leach field cannot handle the amount of flow, <br />an emergency spillway is located in the lower corner of the leach field. Excess water will enter a ditch <br />that is approximately 2 feet wide and approximately 8 inches deep. See Map G -10 for the exact location <br />of the spillway. <br />The EPDM Product Data Sheet is shown below: <br />PA <br />
The URL can be used to link to this page
Your browser does not support the video tag.