Laserfiche WebLink
Xb — ((0.9)X,0 <br />t= <br />�sclt <br />Where: <br />t = calculated t -value <br />Xbr = bond release site (reclaimed site) sample mean <br />Xfef = reference area sample mean <br />The null hypothesis being tested is that the mean value for the reclaimed site is less than or equal <br />to Q. If the calculated t value is greater than the table t value (alpha = 0.20, dfsaf), then the null <br />hypothesis is rejected and revegetation is deemed successful for the parameter in question. <br />4.6 Liability Period Management - Reclaimed Irrigated Pastureland <br />Maintenance activities will include the normal monitoring for and repair of excessive rilling or gulling, <br />weed and pest control. The rill and gully management and stabilization plan is detailed after the end <br />of this section. Weed and pest control management will be conducted as necessary and in <br />accordance with the plan described after the end of this section. <br />Irrigation management on irrigated pastureland will follow a similar sequence as irrigated cropland <br />since the source of irrigation water is the same (CCC ditch). This can be seen in subsection 5.7.4. <br />However irrigated pastureland may use a sideroll or may use flood irrigation. <br />4.6.1 Fertilization Plan <br />Initial fertilization of Reclaimed Irrigated Pastureland soils will take place during topsoil preparation <br />procedures as described in Section 2.05.4(2)(d) subsection 13.2. Beyond the first year of the liability <br />period, nitrogen and phosphorus will be applied to the Reclaimed Irrigated Pastureland areas and <br />(June 2013 MR 86) 2.05.4(2)(e) - 37 MR b(o <br />,ppm ved <br />zf� Flu') 112 0) 3 <br />