Laserfiche WebLink
(20 6 rc� �0 Oak) VIVL� (V Nc <br />D. Approval of this plan does not relieve me of my responsibility to comply with other applicable <br />state or federal laws, rules, or regulations. <br />E. If previously undiscovered cultural resources (historic or prehistoric objects, artifacts, or sites) <br />are exposed as a result of operations, those operations will not proceed until notification is <br />received from the Authorized Officer that provisions for mitigating unforseen impacts as <br />required by 36 CFR 228.4(e) and 36 CFR 800 have been complied with. <br />F. This plan of operations has been approved for a period of or until DeC .t 2. 617 <br />A new or revised plan must be submitted in accordance with 36 CFR part 228, subpart A, if <br />operations are to be continued after that time period. <br />VIII. OPERATING PLANACCEPTANCE <br />I/We have reviewed and agreed to comply with all conditions in this plan of operations including the <br />required changes, modifications, special mitigation, and reclamation requirements. I/We understand <br />that the bond will not be released until the Authorized Officer in charge gives written approval of the <br />reclamation plan. <br />erato or Authorized Representative) (Date) <br />IX. OPERATING PLANAPPROVAL <br />/�a-"/'v- <br />04ame) <br />L <br />L(Auth icer) <br />(Title) <br />(Date) <br />