Laserfiche WebLink
Section 2.05.3 (4) <br />Ponds, Impoundments, Other Treatment facilities and Diversions <br />Table of Contents <br />Introduction 1 <br />Sediment and Water Control Facilities Plan 1 <br />Collection Ditches, Culverts and Diversion Design Parameters 2 <br />Designs for all Ditches in the Permit Area 4 <br />Sedimentation Pond 4 <br />Design Methodology 6 <br />Special Features 6 <br />Temporary Relocation for CC Company Second Park Lateral Ditch 6 <br />Design Details 7 <br />Timing g <br />Map 2.05.3(4) -1 <br />Map 2.05.3(4) -6 <br />Appendix 2.05.3(4) -1 <br />Appendix 2.05.3(4) -2 <br />Add, - � • —z<i <br />Appendix 2.05.3(4) -3 <br />Appendix 2.05.3(4) -4 <br />Appendix 2.05.3(4) -5 <br />Appendix 2.05.3(4) -6 <br />4►d' O -7 <br />LIST OF MAPS <br />Surface Water Hydrology <br />Pond NHN -001 As -Built <br />NH4 -cn1 '-Wehes As- r3u1'l-jl (Plan <br />NNN -001 C�+tche5 As- r3Uilf ��rosssec�bnS� <br />LIST OF APPENDIX <br />Arcadis Report <br />SECAD De5i'gr) Report- <br />41'044d)_5 Pord s fops _5tgbj')/ y -hng lys i 5 <br />Water Discharge Permit <br />Del -Mont Consultants' Pipeline Design Report for CC Ditch (Nod yep <br />Relocation Report p,-DvIded <br />CCC Ditch Relocation Agreement <br />Pond NHN -001 As -Built <br />NHm -oDI -p fche_s <br />,November 2012 <br />MR%/rV -G1 <br />#PpIN4 <br />03_.Aj4V ` W / 5 <br />