Laserfiche WebLink
July 18,2013 C-1981-028/Keenesburg Strip Mine SLB <br /> that have been Phase III bond released and areas that are undisturbed. Prior to spraying these areas,the operator <br /> should submit a minor revision to the permit application package to clarify plans for weed management practices <br /> on undisturbed and bond released areas within the permit area. <br /> All of Parcel 25 was reseeded last fall,and the west half of the parcel was also covered with additional top sand <br /> prior to seeding. Grasses were emerging, some of which had produced seed(ricegrass). Annual weeds were <br /> prevalent,but apparently not out-competing the desirable grass species at this time. <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement activities were initiated as a result of this inspection, nor are any pending. <br /> PHOTOGRAPHS <br /> Open area of B-Pit,north end Ash disposal in B-Pit <br /> Parcel B,west of B Pit Parcel 30 on left,Parcel 29 on right <br /> Number of Partial Inspection this Fiscal Year: 1 <br /> Number of Complete Inspections this Fiscal Year: 0 <br /> Page 3 of 3 <br />