Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 002 Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />HAYDEN <br />Total one -way travel distance: <br />9.50 miles <br />Average Travel Speed: <br />40.00 mph <br />Total Non - Roadable Mob /Demob Cost * <br />$921.21 <br />`* two round trips with haul rig: <br />NA <br />Total Roadable Mob /Demob Cost ** <br />$24.11 <br />* * one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.24 <br />0.24 <br />0.24 <br />0.24 <br />0.50 <br />NA <br />0.50 <br />NA <br />1.48 <br />0.48 <br />Total job time <br />2.95 Hours <br />Total job cost: $945.32 <br />CIRCES Cost Estimating Software <br />