My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-07-17_REVISION - X201123102 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
X201123102
>
2013-07-17_REVISION - X201123102 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:22:36 PM
Creation date
7/17/2013 9:30:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X201123102
IBM Index Class Name
REVISION
Doc Date
7/17/2013
Doc Name
Proposed Decision Letter & Cost Estimate
From
DRMS
To
Peabody Sage Creek Mining, LLC
Type & Sequence
SL1
Email Name
ERR
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />Task description: Mobilization /Demobilization of E <br />Peabody Sage Creek 2011 Permit Action: <br />Site: Exploration Project SL1 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 7/15/2013 County: Routt <br />User: ERR <br />Agency or organization name: DBMS <br />EQUIPMENT TRANSPORT RIG COST <br />Page 1 of 2 <br />Permit/Job #: X201123102 <br />Abbreviation: None <br />Filename: X231 -002 <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON- HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities <br />0 -25 Tons <br />26 -50 Tons <br />51+ Tons <br />Ownership Cost /Hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating Cost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper Cost /Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost /Hour: <br />$88.67 <br />$117.55 <br />$125.45 <br />NON ROADABLE EQUIPMENTZ. <br />Machine <br />Weight/ <br />Owner ship <br />Haul Rig <br />Fleet <br />Haul Trip <br />Return Trip <br />DOT Permit <br />Description <br />Unit <br />Cost/hr/ unit <br />Cost /hr /unit <br />Size <br />Cost/hr/ <br />Cost/hr/ fleet <br />Cost/ fleet <br />(TONS) <br />fleet <br />SCHRAMM <br />1.25 <br />$64.50 <br />$88.67 <br />1 <br />$153.17 <br />$88.67 <br />$250.00 <br />T450BH <br />Subtotals: 1 $153.177 $88.67 $250.00 <br />ROADABLE EQUIPMENT: <br />Machine Description Total Cost/hr/ unit <br />Fleet Size <br />Haul Trip <br />Cost /hr/ fleet <br />Return Trip <br />Cost/hr/ fleet <br />Water Tanker. 2,500 Gal. $50.75 <br />1 <br />$50.75 <br />$50.75 <br />Subtotals: 1 $50.75 1 $50.75 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.