Laserfiche WebLink
PERMIT #: M -1978 -283 <br />INSPECTOR'S INITIALS: TOD <br />INSPECTION DATE: June 20, 2013 <br />INSPECTION TOPIC: Revegetation <br />PROBLEM /POSSIBLE VIOLATION: Problem: Tamarisk (salt cedar) trees are present within or have volunteered <br />into the permit area and are becoming established. This is a problem for failure to employ weed control <br />methods for a state listed noxious weed species within the permitted area, and to reduce the spread of weeds <br />to nearby areas as required by Section 3.1.10 (6) of the rule. <br />CORRECTIVE ACTIONS: The operator shall either implement the existing weed control plan, or develop a weed <br />control and management plan in accordance with Section 3.1.10 (6) of the Rule. This plan should be developed <br />in consultation with the county extension agency, or weed control district office and should include specific <br />control measures to be applied, a schedule for when control measures will be applied and a post- treatment <br />monitoring plan. This weed control plan shall be submitted to the Division as a Technical Revision to the <br />approved plan with the appropriate Technical Revision fee of $216.00 by the corrective action date. <br />CORRECTIVE ACTION DUE DATE: 8/09/13 <br />INSPECTION TOPIC: Signs & Markers <br />PROBLEM /POSSIBLE VIOLATION: Problem: A mine I.D. sign was located at the entrance to the mine site, <br />however the sign was not legible. This is a problem for failure to post a mine identification sign as required by <br />Section 3.1.12(1) of the rule. <br />CORRECTIVE ACTIONS: The operator shall, at the entrance of the mine site, post a sign which shall be clearly <br />visible from the access road with the following: the name of the operator, a statement that a reclamation <br />permit for the operation has been issued by the Colorado Mined Land Reclamation Board; and the permit <br />number. The operator shall submit photo documentation that a proper sign has been posted by the corrective <br />action date. <br />CORRECTIVE ACTION DUE DATE: 8/09/13 <br />Page 2 of 5 <br />