My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-07-01_GENERAL DOCUMENTS - C1981018
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981018
>
2013-07-01_GENERAL DOCUMENTS - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:21:52 PM
Creation date
7/8/2013 1:27:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
General Documents
Doc Date
7/1/2013
Doc Name
Proposed Decision & Findings (PR8)
From
DRMS
To
Blue Mountain Energy, Inc
Permit Index Doc Type
Findings
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stipulation No. 7: <br />THE APPLICANT MUST ALSO COMMIT TO PROVIDING A MITIGATION PLAN <br />SHOULD THE EFFECTS OF DRAWDOWN IN THE WHITE RIVER ALLUVIAL AQUIFER <br />DETRIMENTALLY AFFECT ESTABLISHED AGRICULTURAL ACTIVITIES, EITHER <br />THROUGH UNFORESEEN IMPACTS OR FROM GROUNDWATER DEPLETIONS WHICH <br />ARE LARGER THAN EXPECTED. <br />Status: This stipulation was satisfied and terminated on May 9, 1986. <br />Stipulation No. 8: <br />PRIOR TO THE DEVELOPMENT OF MAINS AND SUB -MAINS BENEATH THE <br />ALLUVIAL BODY OF RED WASH, THE APPLICANT MUST SUBMIT THE <br />INFORMATION REQUIRED BY SECTION 2.06.8(4) OF THE COLORADO REGULATORY <br />PROGRAM, ALONG WITH THE PLAN TO ENSURE THAT THE PERFORMANCE <br />STANDARDS AND MONITORING REQUIREMENTS OF SECTION 4.24 ARE MET. THIS <br />PLAN MUST ADDRESS THE ANALYSIS OF SUBSIDENCE MONITORING DATA UNTIL <br />THE SUBMITTALS ARE APPROVED BY THE REGULATORY AUTHORITY. <br />Status: This stipulation was satisfied and terminated on May 9, 1986. <br />Stipulation No. 9: <br />THE APPLICANT MUST ALSO SUBMIT, AS PART OF THE PERMIT APPLICATION, <br />WRITTEN DOCUMENTATION AS TO THE NATURE OF THE REGIONAL IRRIGATION <br />INVENTORY PERFORMED. THIS DOCUMENTATION MUST ADDRESS THE <br />DEFICIENCIES OUTLINED IN SECTION C OF THIS TEA, SO THAT THE AVF <br />DETERMINATION FOR SCULLION GULCH CAN BE ADEQUATELY SUBSTANTIATED. <br />THE INFORMATION SHOULD BE SUBMITTED WITHIN 30 DAYS OF THE GRANTING <br />OF THE PERMIT. <br />Status: This stipulation was satisfied and terminated on August 10, 1981. <br />Stipulation No. 10: <br />THE APPLICANT SHALL PROVIDE THE REGULATORY AUTHORITY WITH A <br />CORRECTED VERSION OF MAP 77, REFUSE DISPOSAL AREA SITE PREPARATION, <br />WHICH SHOWS THE LOCATION OF THE CULVERT THAT CARRIES FLOW FROM <br />THE NON -TOXIC FILL STOCKPILE DITCH ACROSS THE HAUL ROAD INTO THE <br />SUBAREA R2 -3 SEDIMENT POND. THIS INFORMATION SHOULD BE SUBMITTED <br />WITHIN 90 DAYSOF APPROVAL OF THE MINE PLAN PERMIT. <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.