cc� <br />� r <br />� -- <br />A total of 1380 feet of Secondary underdrain has been completed. <br />Primary Underdrain: <br />No work was performed on the Primary underdrain during this reporting period. <br />A total of 1280 feet of Primary underdrain has been completed. <br />rim <br />Temporary Underdrain: <br />A CAT 345 excavator was observed excavating the pipe trench for future placement of the Temporary underdrain <br />pipe thru the Hwy 67 embankment. Pipe welding and installation is planned for Sunday June 9th. <br />Underdrain Ponds: <br />Concrete for the underdrain Ponds are complete, no other work was performed. <br />Tree /Slash Clearing, Chipping: <br />Seed Masters paused operations until further notice. <br />B) Underground Workings <br />Confirmatory drilling continued during the reporting period on UG Working No. 6158 and 06136. All drill locations <br />were spaced on 4( + / -) foot centers and drilled to specified depth. Exploratory excavation will continue until <br />remediation has been performed. <br />During this reporting period no exploratory excavation was performed. <br />During this reporting period no remediation efforts were performed or completed. <br />C) Highway 67 <br />MHT#2 is in place and is working properly. Highway 67 embankment fill continued during this reporting period. <br />In Storm Water Management <br />Best Management Practices (BMP) are being performed. <br />CQA ACTIVITIES: <br />I) Field Activities: Construction activities and observation of clearing and grubbing within the VLF Phase I limits, <br />underground workings, HWY 67 embankment fill placement, were field tasks performed during this reporting period as <br />required per project specifications. <br />II) Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture- Density, gradations and material classification and identifications and material sampling were performed during <br />this reporting period as required. <br />General Project Items <br />Meetings and Discussions: Weekly Project Status meeting was held at 10:00am on June 40, between CC &V, Ames and <br />Amec. Topics discussed were Safety, Schedule, Project Issues, concerns and planning. <br />Summary of Concerns: None <br />CC &V: Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, Amec and Ames. <br />Page 2 of 6 MLE2 WE 06.08.13.doc <br />