Laserfiche WebLink
Idarado Mining Company <br />2012 /2013 Annual Report <br />Permit Number: M- 1977 - 403 -HR <br />Anniversary Date: July 1, 2013 <br />Idarado Mining Company (IMC) is implementing remediation and reclamation activities pursuant to the <br />Consent Decree (D. Colorado Civil Action No. 83 -C -2385) between the State of Colorado Department of <br />Public Health and Environment (CDPHE), the State of Colorado Office of Attorney General, and IMC. <br />All field reclamation and remediation activities prescribed by the Remedial Action Plan (RAP) have been <br />completed. Monitoring and maintenance of these reclamation and remedial activities are being performed <br />and will continue to be conducted until each of the performance criteria is achieved or modified. <br />Site activities conducted during the anniversary year related to the permit included: <br />Conducting operation and maintenance of the RAP remedial elements where monitoring activities <br />determined that repairs or maintenance was required. All monitoring and maintenance activities <br />were completed according to the specifications and requirements of the RAP. Operation, <br />maintenance and monitoring activities consist of: <br />• Inspecting, cleaning and repairing, as necessary, runoff diversion and conveyance channel <br />systems at the Telluride and Red Mountain tailing piles during the spring and fall seasons, <br />• Performing diversion channel inspections and maintenance, as necessary, following substantial <br />storm events, <br />• Conducting visual inspections of the Telluride and Red Mountain tailing piles, <br />• Conducting and monitoring rodent control on the Telluride and Red Mountain tailing piles, <br />• Performing remediation of bare areas on Telluride Tailing Pile 4 according to the approved <br />Bare Area Work Plan for the Idarado Tailing Piles, <br />• Managing water from the Red Mountain and Telluride underground mine workings throughout <br />the reporting period in accordance with the RAP provisions, including routine maintenance of <br />the Mill Level infiltration lagoons, constructing a gravel filter bed in Mill Level infiltration <br />lagoon #5, and maintenance of the Treasury Tunnel portal. <br />• Monitoring vegetation cover and density of the Telluride and Red Mountain tailing piles, <br />• Performing periodic water quality monitoring according to the schedule and requirements <br />prescribed in the RAP. <br />2. Mining and milling operations associated with the Idarado Mine are not and were not operational <br />during the permit year. No mining beneficiation or rock waste /tailing disposal operations were <br />conducted during the permit year. <br />3. No new surface land disturbances were conducted in the 2012/2013 anniversary year. <br />4. During the 2012 field season the noxious weed control program continued with inspections and <br />control measures conducted at the Telluride and Red Mountain permit areas according to the <br />approved Weed Management Plan for the Idarado Mine Site. Weed control for mullein and <br />